Exam 17: Floor Framing
Exam 1: The Design-Construction Sequence and the Design Professions30 Questions
Exam 2: Views30 Questions
Exam 3: Scales22 Questions
Exam 4: Alphabet of Lines28 Questions
Exam 5: Use of Symbols28 Questions
Exam 6: Plan Views28 Questions
Exam 7: Elevations25 Questions
Exam 8: Sections and Detail24 Questions
Exam 9: Clearing and Rough Grading the Site30 Questions
Exam 10: Locating the Building25 Questions
Exam 11: Site Utilities29 Questions
Exam 12: Footings27 Questions
Exam 13: Foundation Walls28 Questions
Exam 14: Drainage Insulation and Concrete-Slabs24 Questions
Exam 15: Framing Systems26 Questions
Exam 16: Columns, Piers, and Girders18 Questions
Exam 17: Floor Framing27 Questions
Exam 18: Laying Out Walls and Partitions21 Questions
Exam 19: Framing Openings in Walls23 Questions
Exam 20: Roof Construction Terms28 Questions
Exam 21: Roof Trusses21 Questions
Exam 22: Common Rafters27 Questions
Exam 23: Hip and Valley Framing27 Questions
Exam 24: Cornices30 Questions
Exam 25: Windows and Doors31 Questions
Exam 26: Exterior Wall Coverings27 Questions
Exam 27: Decks22 Questions
Exam 28: Finishing Site Work27 Questions
Exam 29: Fireplaces28 Questions
Exam 30: Stairs28 Questions
Exam 31: Insulation and Room Finishing28 Questions
Exam 32: Cabinets21 Questions
Exam 33: Lake House Specifications26 Questions
Exam 34: Orienting the Drawings26 Questions
Exam 35: Fire Rated and Acoustical Considerations24 Questions
Exam 36: Seismic Considerations32 Questions
Exam 37: Heavy Commercial Construction30 Questions
Exam 38: Coordination of Drawings25 Questions
Exam 39: Structural Drawings30 Questions
Exam 40: HVAC Plumbing Drawings28 Questions
Exam 41: Electrical Drawings30 Questions
Select questions type
Floor framing can be ____ to create a seemingly unsupported deck.
(Multiple Choice)
4.8/5
(38)
To prevent the sill plate from coming in direct contact with the foundation and to seal any small gaps, a ____ is often included.
(Multiple Choice)
4.9/5
(34)
____ are the parallel framing members that make up most of the floor framing.
(Multiple Choice)
4.8/5
(30)
All lumber in contact with the foundation, including the sill plate, must be ____ (PT) with an approved chemical to prevent decay.
(Multiple Choice)
4.8/5
(31)
A termite shield is a continuous ____ shield that prevents termites from getting to the wood superstructure.
(Multiple Choice)
4.8/5
(42)
Being more dimensionally stable, ____ are less apt to cause weaknesses in the structure or openings for air infiltration.
(Multiple Choice)
4.9/5
(44)