Exam 2: Continuous Improvement

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Flow analysis charts are used to show analysis of the points in flow which have been displayed in a flow chart. Which of the following would require a flow analysis?

(Multiple Choice)
4.8/5
(35)

Which phase of the DMAIC model has core activities which include developing the project charter and deliverables?

(Multiple Choice)
4.9/5
(26)

Supplier assessment and feedback allows the organization to determine supplier performance in terms of quality and service. Which form of cost management is a quality-related term that encompasses the physical aspects of a product, its desired performance, and its appropriateness of application?

(Multiple Choice)
4.8/5
(29)

Which choice below would NOT be included in the ground rules for team functioning that shows respect to others?

(Multiple Choice)
4.9/5
(34)

Standards other than those of the International Standards Organization are also used for quality improvement. Which group choice below does NOT develop standards which enhance quality?

(Multiple Choice)
4.8/5
(34)

All of the following tools can be used to determine the scope of a lean project EXCEPT?

(Multiple Choice)
4.8/5
(36)

When collecting data on the frequency or patterns of problems or defects, the best form of data collection would be which of the following?

(Multiple Choice)
4.9/5
(36)

Pull systems are triggered by demand in lean production and small batches are produced as triggers indicate replenishment is needed. Which of the following is a descriptor of a push system?

(Multiple Choice)
4.8/5
(42)

Continuous process improvement includes a focus on the processes of the organization where non-value-added activities are eliminated. Which of the following describes Mura in a waste analysis?

(Multiple Choice)
4.9/5
(37)

In material handling, the best asset tracking system for warehouse inventory monitoring would be which of the following?

(Multiple Choice)
4.8/5
(34)

Quality Function Deployment (QFD) is used to relate the characteristics that customers value to the specific features and specifications of the product. Quality Function Deployment is often called the "house of quality" from its appearance. Which of the following scoring choices is NOT included in the QFD process?

(Multiple Choice)
4.8/5
(39)

Scott Namos is performing supplier benchmarking for Billings Distribution Company. He notices that capabilities are not matching demands in terms of what actually exists and what should exist. What would be his BEST course of action?

(Multiple Choice)
5.0/5
(28)

Value stream mapping is mapping of all activities (both value-added and non-value-added) that are needed to bring a product from its raw material state into a state ready for use by a customer. Which of the following baseline measurements in a value stream map would measure the amount of work that fluctuates for a given activity?

(Multiple Choice)
4.7/5
(37)

Which of the following choices is NOT a scenario where a lean practitioner would use a tree diagram?

(Multiple Choice)
4.9/5
(29)

Business continuity plans are important in the overall project plan because of what?

(Multiple Choice)
4.8/5
(32)

Organizing flow is typically done with the critical path method and value stream mapping. Which of the following would NOT be included in the benefits of the critical path method when organizing flow?

(Multiple Choice)
4.8/5
(32)

The DMAIC methodology is a data-driven quality strategy for improving processes. What are the steps in the DMAIC model?

(Multiple Choice)
4.8/5
(29)

The International Standards Organization(ISO) is the world's largest developer of voluntary International Standards. Which quality management standard covers basic concepts and language?

(Multiple Choice)
4.9/5
(38)

A strategic business assessment leverages lean and corporate planning techniques to develop a foundation for quality and productivity improvements. Which of these tools is used in a strategic business assessment?

(Multiple Choice)
4.8/5
(41)

Variety reduction in a product or manufacturing environment includes all of the following EXCEPT?

(Multiple Choice)
5.0/5
(33)
Showing 141 - 160 of 160
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)