Exam 4: Tools and Techniques for Quality Improvement
Exam 1: Introduction to Quality and Performance Excellence79 Questions
Exam 2: Frameworks for Quality and Performance Excellence80 Questions
Exam 3: Tools and Techniques for Quality Design and Control79 Questions
Exam 4: Tools and Techniques for Quality Improvement79 Questions
Exam 5: Competitive Advantage and Strategic Management for Performance Excellence78 Questions
Exam 6: Quality in Customer Supplier Relationships80 Questions
Exam 7: Designing Organizations for Performance Excellence82 Questions
Exam 8: Quality Teamwork80 Questions
Exam 9: Engagement, Empowerment, and Motivation80 Questions
Exam 10: Leadership for Performance Excellence80 Questions
Exam 11: Performance Excellence and Organizational Change80 Questions
Select questions type
In the DMAIC process used in Six Sigma, the process of drilling down to a more specific problem statement is called:
(Multiple Choice)
4.8/5
(35)
In the PDCA cycle, using feedback to incorporate improvements in the next phase of planning happens in the _____ stage.
(Multiple Choice)
4.8/5
(33)
Dimensional characteristics such as distance, weight, volume, and time are common examples of attribute data.
(True/False)
4.7/5
(33)
A Pareto diagram is often used to analyze the attribute data collected in check sheets.
(True/False)
4.8/5
(33)
One of the mechanisms used to encourage innovation and creativity in the Malcolm Baldrige National Quality Award Criteria for Performance Excellence is the prescriptive nature of the criteria, which channels activities toward following procedures, not toward purpose.
(True/False)
4.8/5
(30)
The term _____ refers to approaches that produce exceptional results, are usually innovative in terms of the use of technology or human resources, and are recognized by customers or industry experts.
(Multiple Choice)
4.9/5
(29)
_____, first proposed by Walter Shewhart in 1924, are the backbone of statistical process control.
(Multiple Choice)
4.9/5
(37)
A _____ is an intense and rapid improvement process in which a team or a department throws all its resources into an improvement project over a short time period.
(Multiple Choice)
4.9/5
(32)
Control charts are useful for identifying improvement opportunities and verifying that improvements really do have the desired effect.
(True/False)
4.9/5
(32)
With respect to the types of quality-related data, _____ data are obtained by counting or from some type of visual inspection.
(Multiple Choice)
4.8/5
(34)
The number of invoices that contain errors, the number of parts that conform to specifications, and the number of surface defects on an automobile panel are examples of _____ data.
(Multiple Choice)
4.9/5
(37)
In which phase of the DMAIC process does statistical thinking play a critical role?
(Multiple Choice)
4.8/5
(32)
The Kanban strategy has been called "the single most important concept in Japanese management-the key to Japanese competitive success."
(True/False)
4.9/5
(35)
To be able to improve a process, it must be repeatable and measurable.
(True/False)
4.8/5
(41)
In the DMAIC process used in Six Sigma, the characteristics that have the most impact on product or service performance are called:
(Multiple Choice)
4.8/5
(31)
Showing 41 - 60 of 79
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)