Exam 9: Systems Development and Project Management: Corporate Responsibility

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

__________________ testing verifies that separate systems can work together passing data back and forth correctly.

Free
(Short Answer)
4.8/5
(35)
Correct Answer:
Verified

Integration

What do software engineers use as tools to provide automated support for the development of the system?

Free
(Multiple Choice)
4.8/5
(40)
Correct Answer:
Verified

D

Which phase of the SDLC gathers business requirements?

Free
(Multiple Choice)
4.7/5
(39)
Correct Answer:
Verified

B

Rational _________ process (RUP)methodology,owned by IBM,provides a framework for breaking down the development of software into four "gates."

(Short Answer)
4.8/5
(49)

______________ reporting is an internal report that highlights situations occurring outside of the normal operating range for a condition or standard.

(Short Answer)
4.8/5
(30)

The project requirements document defines the specifications for product/output of the project and is key for managing expectations,controlling scope,and completing other planning efforts.

(True/False)
4.7/5
(42)

The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.

(True/False)
4.7/5
(34)

A(n)_____ chart is a graphical network model that depicts a project's tasks and the relationships between those tasks.

(Short Answer)
4.8/5
(39)

What is a business requirement?

(Multiple Choice)
4.7/5
(40)

Project ____________ represent key dates when a certain group of activities must be performed.

(Short Answer)
4.9/5
(30)

A(n)____________ is a temporary endeavor undertaken to create a unique product,service,or result.

(Short Answer)
4.9/5
(46)

Time,cost,and ___________ are the three primary variables in any project.

(Short Answer)
4.7/5
(43)

_____________ is a technique for generating ideas by encouraging participants to offer as many ideas as possible in a short period without any analysis until all the ideas have been exhausted.

(Short Answer)
4.9/5
(46)

What is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors?

(Multiple Choice)
4.9/5
(39)

What are specific factors that can limit options including budget,delivery dates,available skilled resources,and organizational policies?

(Multiple Choice)
4.9/5
(40)

Workshop training is held in a classroom environment and led by an instructor.

(True/False)
4.7/5
(38)

____________ maintenance makes system changes to repair design flaws,coding errors,or implementation issues.

(Short Answer)
4.8/5
(38)

A project _____________ is any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.

(Short Answer)
4.9/5
(37)

Which phase does the firm analyzes its end-user business requirements and refines project goals into defined functions and operations of the intended system?

(Multiple Choice)
4.9/5
(39)

Explain the business benefits associated with successful software development.

(Essay)
4.7/5
(39)