Exam 9: Systems Development and Project Management: Corporate Responsibility
Exam 1: Management Information Systems: Business Driven MIS315 Questions
Exam 2: Decisions and Processes: Value Driven Business331 Questions
Exam 3: Ebusiness: Electronic Business Value385 Questions
Exam 4: Ethics and Information Security: Mis Business Concerns344 Questions
Exam 5: Infrastructures: Sustainable Technologies252 Questions
Exam 6: Data: Business Intelligence286 Questions
Exam 7: Networks: Mobile Business268 Questions
Exam 8: Enterprise Applications: Business Communications241 Questions
Exam 9: Systems Development and Project Management: Corporate Responsibility293 Questions
Exam 10: Hardware and Software Basics212 Questions
Exam 11: Networks and Telecommunications109 Questions
Exam 12: Designing Databases32 Questions
Select questions type
__________________ testing verifies that separate systems can work together passing data back and forth correctly.
Free
(Short Answer)
4.8/5
(35)
Correct Answer:
Integration
What do software engineers use as tools to provide automated support for the development of the system?
Free
(Multiple Choice)
4.8/5
(40)
Correct Answer:
D
Which phase of the SDLC gathers business requirements?
Free
(Multiple Choice)
4.7/5
(39)
Correct Answer:
B
Rational _________ process (RUP)methodology,owned by IBM,provides a framework for breaking down the development of software into four "gates."
(Short Answer)
4.8/5
(49)
______________ reporting is an internal report that highlights situations occurring outside of the normal operating range for a condition or standard.
(Short Answer)
4.8/5
(30)
The project requirements document defines the specifications for product/output of the project and is key for managing expectations,controlling scope,and completing other planning efforts.
(True/False)
4.7/5
(42)
The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
(True/False)
4.7/5
(34)
A(n)_____ chart is a graphical network model that depicts a project's tasks and the relationships between those tasks.
(Short Answer)
4.8/5
(39)
Project ____________ represent key dates when a certain group of activities must be performed.
(Short Answer)
4.9/5
(30)
A(n)____________ is a temporary endeavor undertaken to create a unique product,service,or result.
(Short Answer)
4.9/5
(46)
Time,cost,and ___________ are the three primary variables in any project.
(Short Answer)
4.7/5
(43)
_____________ is a technique for generating ideas by encouraging participants to offer as many ideas as possible in a short period without any analysis until all the ideas have been exhausted.
(Short Answer)
4.9/5
(46)
What is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors?
(Multiple Choice)
4.9/5
(39)
What are specific factors that can limit options including budget,delivery dates,available skilled resources,and organizational policies?
(Multiple Choice)
4.9/5
(40)
Workshop training is held in a classroom environment and led by an instructor.
(True/False)
4.7/5
(38)
____________ maintenance makes system changes to repair design flaws,coding errors,or implementation issues.
(Short Answer)
4.8/5
(38)
A project _____________ is any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.
(Short Answer)
4.9/5
(37)
Which phase does the firm analyzes its end-user business requirements and refines project goals into defined functions and operations of the intended system?
(Multiple Choice)
4.9/5
(39)
Explain the business benefits associated with successful software development.
(Essay)
4.7/5
(39)
Showing 1 - 20 of 293
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)