Exam 9: Systems Development and Project Management: Corporate Responsibility

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Preventative maintenance makes system changes to reduce the chance of future system failure.

(True/False)
4.8/5
(39)

_____________ report periodic reviews of actual performance versus expected performance.

(Short Answer)
4.9/5
(41)

What is an internal department that oversees all organizational projects?

(Multiple Choice)
4.9/5
(31)

Bugs are defects in the code of an information system.

(True/False)
4.8/5
(36)

The ____________ phase brings all the project pieces together into a special testing environment to eliminate errors and bugs,and verify that the system meets all the business requirements defined in the analysis phase.

(Short Answer)
4.8/5
(34)

The ___________ methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.

(Short Answer)
4.8/5
(42)

Discovery prototyping builds a small-scale representation or working model of the system to ensure it meets the user and business requirements.

(True/False)
4.9/5
(40)

What defines all project roles and indicates what responsibilities are associated with each role?

(Multiple Choice)
4.9/5
(39)

The ___________ phase involves performing changes,corrections,additions,and upgrades to ensure the system continues to meet the business goals.

(Short Answer)
4.8/5
(33)

Which of the following is an outsourcing challenge caused by contract length?

(Multiple Choice)
4.9/5
(39)

Which implementation discards the legacy system completely and immediately migrates all users to the new system?

(Multiple Choice)
4.9/5
(38)

The __________ phase establishes a high-level plan of the intended project and determines project goals.

(Short Answer)
5.0/5
(28)

Off-the-shelf application software supports general business processes and does not require any specific software customization to meet the organization's needs.

(True/False)
4.9/5
(39)

Which phase takes all the detailed design documents from the design phase and transforms them into the actual system?

(Multiple Choice)
5.0/5
(47)

Online training runs over the Internet or on a CD or DVD,and employees complete the training on their own time at their own pace.

(True/False)
4.8/5
(38)

A __________________ definition document prioritizes all of the business requirements by order of importance to the company.

(Short Answer)
4.8/5
(40)

The ________________ phase takes all the detailed design documents from the design phase and transforms them into the actual system.

(Short Answer)
4.7/5
(35)

Outsourcing is a common approach using the professional expertise within an organization to develop and maintain the organization's information technology systems.

(True/False)
4.9/5
(38)

What is the design phase in the SDLC?

(Multiple Choice)
5.0/5
(41)

A ____________ agent is a person or event that is the catalyst for implementing major changes for a system to meet business changes.

(Short Answer)
4.7/5
(41)
Showing 261 - 280 of 293
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)