Exam 9: Systems Development and Project Management: Corporate Responsibility
Exam 1: Management Information Systems: Business Driven MIS315 Questions
Exam 2: Decisions and Processes: Value Driven Business331 Questions
Exam 3: Ebusiness: Electronic Business Value385 Questions
Exam 4: Ethics and Information Security: Mis Business Concerns344 Questions
Exam 5: Infrastructures: Sustainable Technologies252 Questions
Exam 6: Data: Business Intelligence286 Questions
Exam 7: Networks: Mobile Business268 Questions
Exam 8: Enterprise Applications: Business Communications241 Questions
Exam 9: Systems Development and Project Management: Corporate Responsibility293 Questions
Exam 10: Hardware and Software Basics212 Questions
Exam 11: Networks and Telecommunications109 Questions
Exam 12: Designing Databases32 Questions
Select questions type
Which of the following is not one of the four gates in the RUP methodology?
(Multiple Choice)
4.9/5
(39)
Which reports provide an internal report that highlights situations occurring outside of the normal operating range for a condition or standard?
(Multiple Choice)
4.8/5
(35)
Project assumptions are specific factors that can limit options including budget,delivery dates,available skilled resources,and organizational policies.
(True/False)
4.8/5
(35)
Conversion occurs when a person or event is the catalyst for implementing major changes for a system to meet business changes.
(True/False)
4.7/5
(41)
Project __________________ are individuals and organizations actively involved in the project or whose interests might be affected as a result of project execution or project completion.
(Short Answer)
4.9/5
(32)
Pilot implementation is a small group of people use the new system until it is verified that it works correctly then the remaining users migrate.
(True/False)
4.8/5
(37)
Detailed internal reports present information with little or no filtering or restrictions of the data.
(True/False)
4.9/5
(34)
__________ objects for information and related technology (COBIT)is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors.
(Short Answer)
4.9/5
(36)
What statement links the project to the organization's overall business goals.It describes the business need (the problem the project will solve)and the justification,requirements,and current boundaries for the project?
(Multiple Choice)
4.7/5
(35)
____________ is a common approach using the professional expertise within an organization to develop and maintain the organization's information technology systems.
(Short Answer)
5.0/5
(47)
Information systems __________ reports assess a company's information system to determine necessary changes and to help ensure the information systems' availability,confidentiality,and integrity.
(Short Answer)
4.8/5
(32)
___________ outsourcing refers to contracting an outsourcing arrangement with a company in a nearby country.
(Short Answer)
4.7/5
(43)
Project milestones are any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.
(True/False)
4.9/5
(36)
What is also provided for the system users and can be online or in a classroom?
(Multiple Choice)
4.9/5
(41)
The testing phase takes all the detailed design documents from the design phase and transforms them into the actual system.
(True/False)
4.9/5
(31)
Which of the following is not a characteristic of a well-defined project plan?
(Multiple Choice)
4.7/5
(40)
The _________ methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirement.
(Short Answer)
4.7/5
(29)
Showing 181 - 200 of 293
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)