_____________ methodology,uses small teams to produce small pieces of software using a series of "sprints," or 30-day intervals,to achieve an appointed goal.

(Short Answer)
5.0/5
(26)

What emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?

(Multiple Choice)
4.9/5
(34)

The analysis phase establishes descriptions of the desired features and operations of the system including screen layouts,business rules,process diagrams,pseudo code,and other documentation.

(True/False)
4.8/5
(29)

___________ desk are a group of people who respond to users questions.

(Short Answer)
4.8/5
(39)

Explain the three different types of outsourcing along with their benefits and challenges.

(Essay)
4.9/5
(39)

What is a project charter?

(Multiple Choice)
4.8/5
(39)

Unit testing uses both the legacy system and new system until all users verifies that the new system functions correctly.

(True/False)
4.8/5
(49)

Summary internal reports highlight situations occurring outside of the normal operating range for a condition or standard.

(True/False)
4.7/5
(38)

A project ____________ is a formal,approved document that manages and controls project execution.

(Short Answer)
4.8/5
(46)

What is a project manager?

(Multiple Choice)
4.7/5
(35)

Sign-off is the users' actual signatures indicating they approve all of the business requirements.

(True/False)
4.8/5
(36)

Which methodology ends each day or begins with a stand-up meeting to monitor and control the development effort?

(Multiple Choice)
4.9/5
(36)

What runs over the Internet or on a CD or DVD,and employees complete the training on their own time at their own pace?

(Multiple Choice)
4.7/5
(28)

Information system control reports ensure the reliability of information,consisting of policies and their physical implementation,access restrictions,or recordkeeping of actions and transactions.

(True/False)
4.8/5
(33)

_____________ engineers use computer-aided software engineering (CASE)software tools to provide automated support for the development of the system.

(Short Answer)
4.9/5
(29)

What is any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project?

(Multiple Choice)
4.8/5
(38)

________________ is the process of transferring information from a legacy system to a new system.

(Short Answer)
4.9/5
(33)

What is the application of knowledge,skills,tools,and techniques to project activities to meet project requirements?

(Multiple Choice)
4.9/5
(44)

Test conditions detail the steps the system must perform along with the expected result of each step in the implementation phase the organization places the system into production so users can begin to perform actual business operations with it.

(True/False)
4.9/5
(41)

What breaks a project into tiny phases,and developers cannot continue on to the next phase until the first phase is complete?

(Multiple Choice)
4.8/5
(28)