Which methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements?

(Multiple Choice)
4.9/5
(37)

Which document prioritizes all of the business requirements by order of importance to the company?

(Multiple Choice)
4.8/5
(34)

_____________ implementation is a small group of people use the new system until it is verified that it works correctly then the remaining users migrate.

(Short Answer)
4.8/5
(41)

Which of the following is an issue related to the waterfall methodology?

(Multiple Choice)
4.9/5
(43)

Corrective maintenance makes system changes to reduce the chance of future system failure.

(True/False)
4.9/5
(47)

A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.

(True/False)
4.9/5
(34)

Project ________________ are factors considered to be true,real,or certain without proof or demonstration.

(Short Answer)
4.8/5
(38)

Conversion modifies software to meet specific user or business requirements.

(True/False)
4.9/5
(42)

Which implementation uses both the legacy system and new system until all users verifies that the new system functions correctly?

(Multiple Choice)
4.8/5
(32)

_____________ testing assess if the entire system meets the design requirements of the users.

(Short Answer)
4.8/5
(40)

What determines if the system satisfies the user and business requirements?

(Multiple Choice)
4.7/5
(30)

A(n)__________ chart is a simple bar chart that depicts project tasks against a calendar.

(Short Answer)
4.7/5
(38)

Software ______________ is a disciplined approach for constructing information systems through the use of common methods,techniques,or tools.

(Short Answer)
4.7/5
(39)

Which methodology is owned by IBM?

(Multiple Choice)
4.8/5
(44)

What is a graphical network model that depicts a project's tasks and the relationships between those tasks?

(Multiple Choice)
4.9/5
(38)

Which of the following includes a common reason why change occurs?

(Multiple Choice)
4.9/5
(38)

Post-implementation reports are formal reports or audits of a project after it is up-and-running.

(True/False)
4.9/5
(44)

What modifies software to meet specific user or business requirements?

(Multiple Choice)
4.8/5
(33)

Project objectives are quantifiable criteria that must be met for the project to be considered a success.

(True/False)
4.8/5
(33)

What are project objectives?

(Multiple Choice)
4.7/5
(31)