Exam 22: Extension 7: Learning Curves
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
Which unit, if any, will require approximately one-half the time of the first unit?
(Multiple Choice)
4.8/5
(40)
Assembly of a model airplane has a learning curve of 80 percent.The estimated time to assemble a second identical model airplane is 40 hours.Determine approximately how much time will be required for:
(A) the eighth unit
(B) the first ten units
(Essay)
4.8/5
(30)
If a contract for 30 units is canceled after the first 20 units, approximately how much of the expected total direct labor will have been expended to that point?
(Multiple Choice)
4.8/5
(35)
If we have never made the first unit but only think we know how much the labor time will be, we cannot draw a learning curve.
(True/False)
4.8/5
(37)
A learning percentage of 95% indicates greater learning than a percentage of 90%.
(True/False)
4.8/5
(32)
When the task is fairly complex and has a longer duration, it will take a larger number of repetitions before improvement is observed.
(True/False)
4.7/5
(28)
Unit times for a job exhibit a learning effect.If the 2nd unit took 30 hours, and the 4th unit took 21 hours, roughly how many hours would you estimate the 3rd unit took?
(Multiple Choice)
4.9/5
(38)
The learning curve is a basic tool for mass production type activities because it can deal with large volumes of output.
(True/False)
4.7/5
(40)
Approximately how long did it take to produce the first four units?
(Multiple Choice)
4.8/5
(40)
Learning curves are mostly relevant for complex, new activities that have not been done often.
(True/False)
4.7/5
(36)
A learning rate of 98% implies an exceptionally rapid rate of improvement.
(True/False)
4.8/5
(36)
Approximately how long will it take to produce the 25th through the 30th units?
(Multiple Choice)
4.8/5
(34)
An 80 percent learning curve means that with each doubling of repetitions there will be a 20 percent decrease in time per unit.
(True/False)
4.8/5
(30)
A job will have a learning rate of 75 percent.If the 3rd unit requires 10 hours, the 12th unit should require about this many hours:
(Multiple Choice)
4.8/5
(42)
How long would a job with a 70 percent learning curve and a time of 20 hours for the first unit require (approximately, in hours) for the third unit?
(Multiple Choice)
4.8/5
(38)
The fact that human activities typically improve when they are done on a repetitive basis is described by a/an:
(Multiple Choice)
4.9/5
(33)
The 3rd unit of a ten-unit job required 7.3 hours to complete.The 4th unit has been worked on for two hours, but it is not yet finished.Estimate the remaining amount of time that will be needed to finish this ten-unit job if the work has an 80% learning curve.
(Essay)
4.8/5
(35)
A job is expected to have a 70 percent learning curve.The first unit has been completed in 20 hours.Accordingly, the second unit can be expected to take approximately how many hours?
(Multiple Choice)
4.8/5
(44)
If an 80% curve is appropriate for a task and the first unit takes ten hours, the average time for the first two units would be eight hours.
(True/False)
4.8/5
(37)
When are learning curves most relevant to managerial decision making in mass production settings?
(Multiple Choice)
4.9/5
(32)
Showing 21 - 40 of 68
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)