Which term is most closely associated with cellular manufacturing?

(Multiple Choice)
4.8/5
(35)

If departments X, Y, and Z were to be located in areas I, II, and III, respectively, what would be the total distance (in meters) loads would be moved each week?

(Multiple Choice)
4.9/5
(33)

The benefits of flexible manufacturing systems (FMS) include:

(Multiple Choice)
4.9/5
(37)

An idle percentage of zero means a line is perfectly balanced.

(True/False)
4.8/5
(36)

What is the layout that will minimize the total distance loads will be moved each week?

(Multiple Choice)
4.9/5
(35)

Given the following data: Given the following data:   Determine the percentage idle time. Determine the percentage idle time.

(Essay)
4.8/5
(38)

For output to equal projected demand, what is the minimum number of workstations needed?

(Multiple Choice)
4.7/5
(40)

Which of the following is not a characteristic of layout decisions in system design?

(Multiple Choice)
4.8/5
(33)

A production line is to be designed for a job with three tasks.The task times are 0.4 minutes, 1.2 minutes, and 0.5 minutes.The maximum cycle time in minutes is:

(Multiple Choice)
4.7/5
(38)

Flexible manufacturing systems (FMS) bring the benefits of automation to continuous processes.

(True/False)
4.8/5
(37)

Process layouts feature departments or other functional groupings of personnel or equipment.

(True/False)
4.9/5
(31)

For output to equal projected demand, what should be the actual cycle time for this production line?

(Multiple Choice)
4.8/5
(42)

"Balance delay" is another name for the percentage of idle time in a product layout.

(True/False)
4.8/5
(38)

Computer-aided manufacturing (CAM) refers to the use of computers in:

(Multiple Choice)
4.7/5
(44)

For eight hours of operating time per day and a desired output rate of 960 units per day, what balance (if any) will yield the minimum number of stations?

(Short Answer)
4.9/5
(37)

What is the minimum possible cycle time?

(Short Answer)
4.9/5
(33)

If the company desires that output rate equal demand, what is the last task performed at the second workstation in the balance which uses the minimum number of workstations?

(Multiple Choice)
4.8/5
(37)

Determine the minimum number of workstations needed for this situation: Operating time is 450 minutes per day. Desired output is 80 units per day. The sum of task times is 56 minutes.

(Essay)
4.9/5
(35)

A cafeteria line would be an example of a process focused layout.

(True/False)
4.7/5
(38)

Without regard to demand, what is the minimum possible cycle time (in seconds) for this situation?

(Multiple Choice)
4.8/5
(37)