Exam 4: Process Design and Analysis
Exam 1: Operations and Supply Chain Strategy74 Questions
Exam 2: Quality Management75 Questions
Exam 3: New Product Development75 Questions
Exam 4: Process Design and Analysis75 Questions
Exam 5: Forecasting75 Questions
Exam 6: Independent Demand Inventory75 Questions
Exam 7: Dependent Demand Inventory74 Questions
Exam 8: Project Management75 Questions
Exam 9: Optimization and Simulation Modeling75 Questions
Exam 10: Capacity Planning75 Questions
Exam 11: Quality Improvement Methods75 Questions
Exam 12: Lean Enterprise75 Questions
Exam 13: Technology and Integrated Supply Management75 Questions
Exam 14: Global Supply Chain and Service Integration75 Questions
Select questions type
Cindy's Ceramics produces a standard 4-inch diameter vase with custom decorations related to the season of the year.Her ceramic firing oven can fire four vases at a time.Each firing cycle takes 90 minutes.What is the average cycle time?
(Essay)
5.0/5
(35)
Process choice involves decisions about all of the following except
(Multiple Choice)
4.7/5
(31)
Ted's T-shirts makes custom shirts on equipment that costs $350.The material costs $8 per shirt and sells for $15 per shirt.If he makes 20 shirts,what is the total variable cost?
(Essay)
4.8/5
(31)
Ted's T-shirts makes custom shirts on equipment that costs $350.The material costs $8 per shirt and sells for $15 per shirt.What volume is required to make $1750 a week?
(Essay)
4.9/5
(32)
Which of the following is not an advantage of a product layout?
(Multiple Choice)
4.7/5
(33)
Customers are generally an integral part of the process when delivering services.
(True/False)
4.8/5
(22)
In a paced assembly process,if station A takes 2 minutes per unit,station B takes 1 minute per unit,and station C takes 3 minutes per unit,compute the utilization for each station and identify the bottleneck.
(Essay)
4.9/5
(39)
Ted's T-shirts makes custom shirts on equipment that costs $350.The material costs $8 per shirt and sells for $15 per shirt.How many shirts must be sold to break even?
(Essay)
4.7/5
(27)
Which of the following is not an advantage of a process layout?
(Multiple Choice)
4.8/5
(37)
Constructing a new building on a university campus is an example of a project.
(True/False)
4.8/5
(33)
When a bottleneck is improved by adding another processing station in line with the original station,it is an example of
(Multiple Choice)
4.7/5
(36)
Services are easily inventoried to buffer fluctuations in demand.
(True/False)
4.9/5
(43)
Line processes generally produce high-volume goods using general purpose equipment.
(True/False)
4.8/5
(33)
Which of the following does not describe a continuous process?
(Multiple Choice)
4.9/5
(46)
Which of the following has the lowest unit cost for a discrete process?
(Multiple Choice)
4.7/5
(24)
A product made on an assembly line generally will have a lower unit cost than a product produced in a job shop.
(True/False)
4.7/5
(38)