Exam 11: Managing the New Product Development Process

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Talkaphone decided to emphasize text messaging capabilities in its cell phones and to only incorporate a basic photographic capability.This led to slow sales most likely because

Free
(Multiple Choice)
4.7/5
(40)
Correct Answer:
Verified

C

Which of the following statements is true about parallel development processes?

Free
(Multiple Choice)
4.8/5
(44)
Correct Answer:
Verified

C

Pioneer Cleaning Equipment has begun the actual design and development including the details of manufacturing,marketing,and operations of a new floor buffing machine.Which stage in the stage-gate process comes next?

Free
(Multiple Choice)
4.8/5
(40)
Correct Answer:
Verified

B

Suppliers may be actual members of the product team.

(True/False)
4.8/5
(41)

If R&D engineers fail to communicate directly with manufacturing engineers,features may be planned that cannot be manufactured.

(True/False)
4.9/5
(44)

You are considering involving the suppliers of the electronic components used in the DVD player/recorder your company manufactures in the concept development and design of a new version of the product.Research has shown that including suppliers will result in

(Multiple Choice)
4.9/5
(33)

According to FEMA,firms should

(Multiple Choice)
4.8/5
(35)

One way to reduce direct labor and material handling cost is to minimize the number of parts for a product.

(True/False)
4.7/5
(33)

A _____ of a product is an early working prototype of a product released to users for testing and feedback.

(Multiple Choice)
4.8/5
(30)

Pioneer Cleaning Equipment Company is experimenting with a faster and quieter machine to buff floors.To develop this concept the company is contemplating using the lead user method of concept development.Explain how this method would work and what the advantages of it are.

(Essay)
4.8/5
(38)

Parallel development processes are universally endorsed.

(True/False)
4.8/5
(38)

Joe attended a workshop where the Quality Function Deployment (QFD)method of new product development was explained.During the workshop he asked the following question,"This all seems very complex and quantitative to me.I prefer qualitative checks instead.They are less confusing." If you were the workshop leader,how would you address Joe's concern?

(Essay)
4.7/5
(34)

Pioneer Cleaning Equipment has a basic concept for a new floor buffing machine and a business plan for that machine.Which stage in the stage-gate process comes next?

(Multiple Choice)
4.9/5
(34)

Project champions

(Multiple Choice)
4.8/5
(38)

An "antichampion" is

(Multiple Choice)
4.8/5
(41)

The R&D engineers are often the ones most able to identify the maximum performance capabilities and minimum service requirements of a new product.

(True/False)
4.9/5
(33)

Fuchs Development was trying to decide whether to have a short or long product development cycle.The R&D director said that a shorter cycle is usually better and this is a correct assessment.

(True/False)
4.8/5
(42)

Project champions are more likely to be from marketing.

(True/False)
4.8/5
(42)

Computer-aided manufacturing (CAM)provides faster and more flexible manufacturing than traditional methods.

(True/False)
4.7/5
(42)

Dr.Aznuck is a Professor of Information Systems at Mountain Home University.She conducts courses in computer applications.Why might she be asked to be a beta tester for the latest version of Microsoft Office before it is released?

(Essay)
4.8/5
(34)