Exam 6: Process Selection and Facility Layout

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which phrase most closely describes flexible manufacturing systems?

(Multiple Choice)
4.8/5
(37)

Heuristic approaches to line balancing are the only approach that will guarantee an optimal solution.

(True/False)
4.7/5
(35)

Which of the following process types would be most likely to be used in the introductory phase of a product's life cycle?

(Multiple Choice)
4.7/5
(33)

An idle percentage of zero means a line is perfectly balanced.

(True/False)
4.7/5
(36)

Morale problems can be a reason for redesign of a facility layout.

(True/False)
4.8/5
(38)

The maker of the world-famous Chocolate Chip Cookies needs to design a product layout for a new product, Mint Chocolate Chip. The company plans to use this new production line eight hours a day in order to meet projected demand of 1,440 cases per day. The following table describes the tasks involved in the production of a Mint Chocolate Chip Cookie. Task Time ( secs ) Immediate Predecessor 4 none 14 12 12 6 8 , For output to equal projected demand, what should be the actual cycle time for this production line?

(Multiple Choice)
4.9/5
(36)

Although they do not guarantee optimal solutions, ______________ are useful in finding reasonable solutions when the number of possible options is overwhelming.

(Multiple Choice)
4.9/5
(32)

A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line six hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product: Task Time (secs) Immediate Predecessor 3 none 4 none 5 , 7 none 9 , For output to equal projected demand, what will be the idle time at the second workstation of the assembly line that uses the minimum number of workstations?

(Multiple Choice)
4.9/5
(34)

Layout planning is required because of: (I) efficient operations. (II) accidents or safety hazards. (III) new products or services. (IV) morale problems.

(Multiple Choice)
4.8/5
(43)

A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet projected demand of 480 units per day. The tasks necessary to produce this product are: Task Time (secs) Immediate Predecessor 30 none 30 6 12 54 30 , Without regard to demand, what is the minimum possible cycle time (in seconds) for this situation?

(Multiple Choice)
4.9/5
(37)

The main issue in the design of process layouts concerns the relative positioning of the departments involved.

(True/False)
4.9/5
(41)

A disadvantage of a product layout can be high in-process inventory costs.

(True/False)
5.0/5
(44)

Accounting, purchasing, and inventory control are fairly routine with process layouts.

(True/False)
4.8/5
(39)

Given the following process layout data for locating four departments (A, B, C, and D) in four areas (1, 2, 3, and 4): Distances (meters) Flows (loads per week From/To 1 2 3 4 1 - 50 100 150 2 - 50 100 3 - 50 4 - From/To A B C D A - 10 40 50 B 30 - 10 70 C 60 10 - 40 D 30 50 20 - If department C must be located in area 1, what layout will minimize the total distance loads will be moved each month?

(Short Answer)
4.9/5
(32)

The estimation of costs is generally most difficult when the ___________ process has been chosen.

(Multiple Choice)
4.8/5
(26)

Given the following process layout data for locating four departments (A, B, C, and D) in four areas (1, 2, 3, and 4): Distances (meters) Flows (loads per week From/To 1 2 3 4 1 - 50 100 150 2 - 50 100 3 - 50 4 - From/To A B C D A - 10 40 50 B 30 - 10 70 C 60 10 - 40 D 30 50 20 - What is the distance from area 3 to area 1?

(Short Answer)
4.8/5
(28)

The type of processing system which is used for highly standardized products is:

(Multiple Choice)
4.8/5
(40)

The maximum allowable cycle time is computed as:

(Multiple Choice)
4.8/5
(32)

A common goal in designing process layouts is:

(Multiple Choice)
4.8/5
(42)

In which type of operation are you likely to see, at most, only minor variations in the product or service being produced using the same process and the same equipment?

(Multiple Choice)
4.8/5
(30)
Showing 81 - 100 of 150