Exam 7: Lean Thinking and Lean Systems
Exam 1: The Operations Function29 Questions
Exam 2: Operations and Supply Chain Strategy26 Questions
Exam 3: Product Design28 Questions
Exam 4: Process Selection37 Questions
Exam 5: Service Delivery System Design32 Questions
Exam 6: Process-Flow Analysis26 Questions
Exam 7: Lean Thinking and Lean Systems39 Questions
Exam 8: Managing Quality33 Questions
Exam 9: Quality Control and Improvement38 Questions
Exam 10: Supply Chain Management31 Questions
Exam 11: Forecasting33 Questions
Exam 12: Capacity Planning31 Questions
Exam 13: Scheduling Operations26 Questions
Exam 14: Project Planning and Scheduling26 Questions
Exam 15: Independent Demand Inventory39 Questions
Exam 16: Materials Requirements Planning and ERP34 Questions
Select questions type
Preventive maintenance is another term for stabilizing the master schedule.
Free
(True/False)
4.8/5
(40)
Correct Answer:
False
Takt time is the available time for production divided by demand.
(True/False)
4.8/5
(27)
Define the English terms in the 5S technique.How is this applied in practice?
(Essay)
4.9/5
(38)
With lean thinking,a firm's operations layout should evolve to a cellular manufacturing layout.
(True/False)
4.9/5
(40)
If it takes 100 minutes to complete a circuit,demand at the next work center is 5 parts per minute,and a kanban container holds 20 parts,how many containers are required?
(Multiple Choice)
4.9/5
(35)
Given the following information pertaining to item AX143,determine the appropriate number of kanban cards that should be used to support production. Demand rate = 500 units/week
Time for container to complete circuit = 2 weeks
Safety stock = 30 percent
Size of container = 5 units
(Multiple Choice)
5.0/5
(35)
Which of the following is NOT generally an element of a lean system?
(Multiple Choice)
4.8/5
(31)
Showing 1 - 20 of 39
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)