Exam 14: Project Planning and Scheduling
Exam 1: The Operations Function29 Questions
Exam 2: Operations and Supply Chain Strategy26 Questions
Exam 3: Product Design28 Questions
Exam 4: Process Selection37 Questions
Exam 5: Service Delivery System Design32 Questions
Exam 6: Process-Flow Analysis26 Questions
Exam 7: Lean Thinking and Lean Systems39 Questions
Exam 8: Managing Quality33 Questions
Exam 9: Quality Control and Improvement38 Questions
Exam 10: Supply Chain Management31 Questions
Exam 11: Forecasting33 Questions
Exam 12: Capacity Planning31 Questions
Exam 13: Scheduling Operations26 Questions
Exam 14: Project Planning and Scheduling26 Questions
Exam 15: Independent Demand Inventory39 Questions
Exam 16: Materials Requirements Planning and ERP34 Questions
Select questions type
Which of the following statements is true about a critical path?
Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
D
A work-breakdown structure is used in the scheduling activity of project management.
Free
(True/False)
5.0/5
(37)
Correct Answer:
True
The project management concept that can best be applied to situations such as R&D,computer systems design,and military invasions is:
(Multiple Choice)
4.9/5
(30)
The early start and late start times are equal for an activity on the critical path of a network.
(True/False)
4.8/5
(33)
A forward pass of the above network indicates that the early start time of activity 4-5 is:
(Multiple Choice)
4.8/5
(38)
A network-based project scheduling method that requires three time estimates for each activity is:
(Multiple Choice)
4.7/5
(43)
The advantage(s)of the network method over the Gantt chart is (are)that:
(Multiple Choice)
4.8/5
(32)
The information calculated from the forward and backward pass can be used for:
(Multiple Choice)
4.8/5
(35)
Multiple critical paths can exist under the critical path method (CPM)because:
(Multiple Choice)
4.8/5
(32)
PERT assumes that the statistical variation in total project completion times can be computed by adding the standard deviations along the critical path.
(True/False)
4.8/5
(32)
The advantage(s)that the Gantt chart has over the network method is (are):
(Multiple Choice)
4.9/5
(35)
Which of the following statements is NOT true about the PERT method of project scheduling?
(Multiple Choice)
4.8/5
(31)