Exam 11: Project Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

_________ is a management approach that may be used to make comparisons to "best in class" practices across organizations

Free
(Multiple Choice)
4.9/5
(42)
Correct Answer:
Verified

B

The cybernetic control system that acts to reduce deviations from standard is called a __________.

Free
(Multiple Choice)
4.7/5
(36)
Correct Answer:
Verified

D

With respect to financial controls,courts will require the practice of __________ regarding financial controls,practices,and record-keeping.

Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
Verified

B

The most important rule for any subordinate is the Prime Law of Life on any project: __________.

(Multiple Choice)
4.9/5
(34)

A person with organizational clout who takes on personal responsibility for the successful completion of a project for the organization is referred to as a(n)__________.

(Multiple Choice)
4.9/5
(25)

Control is focused on three elements of a project.They are __________.

(Multiple Choice)
4.9/5
(33)

With few exceptions,the control of projects is exercised through _______.

(Multiple Choice)
4.8/5
(33)

Postproject controls or reviews are examples of __________.

(Multiple Choice)
4.9/5
(31)

In a cybernetic control system using a negative feedback loop,the speed or force with which the control operates is,in general,__________ to the size of the deviation from standard.

(Multiple Choice)
4.9/5
(38)

__________ controls are usually viewed as helpful rather than as a source of unwelcome pressure if the controlees perceive themselves as able to perform inside the prescribed limits.

(Multiple Choice)
4.8/5
(36)

The most common type of control system is the __________,or steering control.

(Multiple Choice)
4.7/5
(37)

The stewardship of human resources requires __________ the growth and development of people.

(Multiple Choice)
4.7/5
(33)

Physical asset control requires control of the __________ of physical assets and is concerned with asset maintenance,whether preventative or corrective.

(Multiple Choice)
4.8/5
(37)

An automatic control system containing a negative feedback loop is referred to as

(Multiple Choice)
4.9/5
(42)

Identify some of the factors that can cause a project to require control of cost.

(Essay)
4.9/5
(38)

A(n)__________ measures performance over time,showing how it changes compared to a desired mean and upper and lower limits.

(Multiple Choice)
4.9/5
(32)

PMBOK recognizes the importance of what is called OP a.What does OPA stand for?

(Multiple Choice)
4.9/5
(40)

Describe the information requirements of a cybernetic controller.

(Essay)
4.8/5
(36)

Which of the following is the key feature of cybernetic control systems?

(Multiple Choice)
4.9/5
(39)

Most control systems used in project management today fall into this category of control system.

(Multiple Choice)
4.9/5
(37)
Showing 1 - 20 of 44
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)