Exam 5: The Project in the Organizational Structure

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Identify the statement that is NOT a major disadvantage of placing the project in the matrix approach.

(Multiple Choice)
4.8/5
(36)

When a project requires the integration of inputs from several functional areas and involves reasonably sophisticated technology,but does not require all the technical specialists to work for the project on a full-time basis,the __________ organizational form should be used.

(Multiple Choice)
4.9/5
(32)

The __________ is a basic project document that describes all the work that must be done to complete the project and forms the basis for costing,scheduling,and work responsibility.

(Multiple Choice)
4.8/5
(28)

When the major focus of a project must be on the in-depth application of a technology rather than on minimizing cost,meeting a specific schedule or achieving speedy response to change,the __________ organizational form is apt to be the form of choice.

(Multiple Choice)
4.9/5
(35)

If the project manager controls when and what people do while the functional managers control who will be assigned to the project and what technology will be used,the __________ organizational form is probably being used.

(Multiple Choice)
4.8/5
(41)

One of the main technical problems faced by the project manager is meeting __________ without compromising performance.

(Multiple Choice)
4.9/5
(24)

Identify the statement that is NOT a major disadvantage of placing a project within a functional element of the parent organization.

(Multiple Choice)
4.9/5
(43)

This member of the project team is responsible for the efficient production of the product of the process,including the manufacturing engineering,design and production of tooling,production scheduling,and other production tasks.

(Multiple Choice)
4.9/5
(39)

The key to conflict resolution is to turn a __________ into a __________.

(Multiple Choice)
4.9/5
(35)

A room where project teams can meet,and where the latest details on project progress will be available,is called the __________.

(Multiple Choice)
5.0/5
(31)

Discuss the advantages of empowering the project team.

(Essay)
4.8/5
(37)

A characteristic of __________ projects is that the work on these projects can cross time,space,organizational,and cultural boundaries.

(Multiple Choice)
4.9/5
(39)

In the systems approach to design,one organization would have to take responsibility for __________.

(Multiple Choice)
4.8/5
(35)

When a firm engages in a large number of similar projects,the __________ organizational form is apt to be preferred.

(Multiple Choice)
4.8/5
(33)

Explain how a company can go about implementing a PMO.

(Essay)
4.8/5
(31)

It is the responsibility of the __________ to ensure that the project is structured in such a way as to allow for motivational factors to be used.

(Multiple Choice)
4.8/5
(34)

A major advantage of using a __________ placement for a project is that individual experts can be utilized by many different projects.

(Multiple Choice)
4.8/5
(32)

The process of dealing with uncertainties in projects that may affect the project for better or for worse has come to be known as __________.

(Multiple Choice)
4.9/5
(32)

Subletting tasks out to smaller contractors is known as __________.

(Multiple Choice)
4.9/5
(34)

A major purpose of the project management office should be to serve as __________.

(Multiple Choice)
4.8/5
(38)
Showing 21 - 40 of 52
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)