Exam 13: Installation and Operations
Exam 1: Introduction to Systems Analysis and Design103 Questions
Exam 2: Project Management157 Questions
Exam 3: Requirements Determination79 Questions
Exam 4: Business Process and Functional Modeling85 Questions
Exam 5: Structural Modeling94 Questions
Exam 6: Behavioral Modeling85 Questions
Exam 7: Moving on to Design99 Questions
Exam 8: Class and Method Design97 Questions
Exam 9: Data Management Layer Design93 Questions
Exam 10: Human Computer Interaction Layer Design80 Questions
Exam 12: Physical Architecture Layer Design74 Questions
Exam 12: Construction79 Questions
Exam 13: Installation and Operations94 Questions
Select questions type
When an organization has one or more locations or units within a location converted first, this is called _____ conversion.
Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
D
The conversion style is the way in which users are switched between the old and new systems. There are two fundamentally different approaches to the style of conversion: direct conversion and ______________________.
Free
(Multiple Choice)
4.8/5
(45)
Correct Answer:
B
The training should cover all the capabilities of the new system so users understand what each module does.
Free
(True/False)
4.9/5
(41)
Correct Answer:
False
The simultaneous direct conversion to SAP to replace all of your legacy systems would result in high risk while requiring an enormous amount of time.
(True/False)
4.8/5
(43)
APS Systems would like to convert to the new system quickly. The ideal conversion strategy for APS Systems would be a conversion style of parallel and a modular conversion.
(True/False)
4.8/5
(35)
Institutionalization refers to using the new system as the normal, accepted, and routine way of performing the business processes.
(True/False)
4.7/5
(42)
Postimplementation activities attempt to _____ the organization after the successful transition to the new system.
(Multiple Choice)
4.8/5
(36)
Install hardware, install software, and convert data are the three steps found in the _____.
(Multiple Choice)
4.9/5
(37)
A migration plan contains two major elements. They are _____.
(Multiple Choice)
4.8/5
(44)
Rather than attempting to teach the users all the features of the system, training should instead focus on the much smaller set of activities that users perform on a regular basis and ensure that users are truly expert in those.
(True/False)
4.9/5
(34)
Which of the following is included as a basic step in a change management plan?
(Multiple Choice)
4.8/5
(35)
Cold turkey, big bang, and abrupt cut-over are alternative names for _____ conversion.
(Multiple Choice)
4.7/5
(43)
The three-stage process for managing organizational change that was developed by Lewin is _____.
(Multiple Choice)
4.8/5
(45)
The conversion style that recommends operating the new system along side the old system for a trial period is known as _____.
(Multiple Choice)
4.9/5
(35)
Direct conversion, where the new system is turned on and the old system is immediately turned off, is the simplest and most straightforward method, but it is also the most risky because any problems with the new system may seriously disrupt the organization.
(True/False)
4.8/5
(36)
Enhancements suggested by users to make the system easier to use are given higher priority than bug fixes.
(True/False)
4.8/5
(28)
The three major steps to the conversion plan before commencement of operations are to install hardware, install software, and convert data; usually these steps must be done sequentially at any one location.
(True/False)
4.8/5
(27)
Showing 1 - 20 of 94
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)