Exam 23: Operational Decision-Making Tools: Linear Programming

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is not a major input into capacity requirements planning (CRP)?

(Multiple Choice)
5.0/5
(29)

Given the following Product Structure Record Given the following Product Structure Record   The number of D's required for each A is The number of D's required for each A is

(Multiple Choice)
4.7/5
(32)

Given the following MRP matrix for Item E: Given the following MRP matrix for Item E:   The projected on hand quantity at the end of period 3 is The projected on hand quantity at the end of period 3 is

(Multiple Choice)
4.9/5
(32)

What is a bill-of-material?

(Essay)
4.7/5
(40)

A matrix is used to organize and display the information generated by the MRP process.

(True/False)
4.8/5
(37)

What steps are necessary to effectively implement Enterprise Resource Planning (ERP)?

(Essay)
4.8/5
(31)

Given the following MRP matrix for Item D: Given the following MRP matrix for Item D:   The planned order release for period 3 is The planned order release for period 3 is

(Multiple Choice)
4.8/5
(39)

A phantom bill of material is used

(Multiple Choice)
4.8/5
(35)

When is it appropriate to use material requirements planning (MRP)?

(Essay)
4.8/5
(44)

With _________________, on-demand IT services are provided over the Internet.

(Multiple Choice)
4.9/5
(39)

Given the following MRP matrix for Item C: Given the following MRP matrix for Item C:   If each order cost $500 and the holding cost is $0.75 per item per period, the periodic order quantity is If each order cost $500 and the holding cost is $0.75 per item per period, the periodic order quantity is

(Multiple Choice)
4.9/5
(33)

Given the following MRP matrix for Item C: Given the following MRP matrix for Item C:   If each order cost $500 and the holding cost is $0.75 per item per period, then using the Periodic Order Quantity lot sizing technique, the projected on hand at the end of period 7 is If each order cost $500 and the holding cost is $0.75 per item per period, then using the Periodic Order Quantity lot sizing technique, the projected on hand at the end of period 7 is

(Multiple Choice)
4.7/5
(29)

The quantities reported on a master production schedule may reflect a combination of actual and forecasted demand.

(True/False)
4.8/5
(41)

An enterprise resource planning (ERP) system shares information across functional areas.

(True/False)
4.9/5
(40)

Lot sizing rules are used in MRP to determine work or purchase order quantities.

(True/False)
4.8/5
(44)

Load leveling is used to resolve underloaded and overloaded capacity conditions.

(True/False)
4.9/5
(39)

Given the following Product Structure Record Given the following Product Structure Record   The number of F's required for each A is The number of F's required for each A is

(Multiple Choice)
4.8/5
(37)

Modular bills of material are used to group small, lose parts together into a kit.

(True/False)
4.9/5
(39)

All of the following are inputs into the MRP process except

(Multiple Choice)
4.9/5
(40)

Given the following MRP matrix for Item C: Given the following MRP matrix for Item C:   If each order cost $500 and the holding cost is $0.75 per item per period, then using the Periodic Order Quantity lot sizing technique, the planned order release for period 1 is If each order cost $500 and the holding cost is $0.75 per item per period, then using the Periodic Order Quantity lot sizing technique, the planned order release for period 1 is

(Multiple Choice)
4.8/5
(42)