Exam 15: Lean Accounting and Productivity Measurement
Exam 1: Introduction to Cost Management151 Questions
Exam 2: Basic Cost Management Concepts199 Questions
Exam 3: Cost Behavior193 Questions
Exam 4: Activity-Based Costing198 Questions
Exam 5: Product and Service Costing: Job-Order System149 Questions
Exam 6: Process Costing181 Questions
Exam 7: Allocating Costs of Support Departments and Joint Products171 Questions
Exam 8: Budgeting for Planning and Control202 Questions
Exam 9: Standard Costing: a Functional-Based Control Approach125 Questions
Exam 10: Decentralization: Responsibility, Accounting, Performance Evaluation, and Transfer Pricing134 Questions
Exam 11: Strategic Cost Management148 Questions
Exam 12: Activity-Based Management146 Questions
Exam 13: The Balanced Scorecard: Strategic-Based Control124 Questions
Exam 14: Quality and Environmental Cost Management199 Questions
Exam 15: Lean Accounting and Productivity Measurement161 Questions
Exam 16: Cost-Volume-Profit Analysis128 Questions
Exam 17: Activity Resource Usage Model and Tactical Decision Making121 Questions
Exam 18: Pricing and Profitability Analysis159 Questions
Exam 19: Capital Investment125 Questions
Exam 20: Inventory Management: Economic Order Quantity, Jit, and the Theory of Constraints127 Questions
Select questions type
In calculating the profit linkage, PQ represents the productivity-neutral quantity of input. How is PQ calculated?
(Multiple Choice)
4.9/5
(39)
Using average product cost for a value stream means that individual product costs are not known. This is adequate mainly because
(Multiple Choice)
4.7/5
(39)
Which of the following is a reason traditional costing approaches may NOT work in a lean manufacturing environment?
(Multiple Choice)
5.0/5
(43)
Under features and characteristics costing, conversion costs are normally assigned
(Multiple Choice)
4.9/5
(38)
Figure 15-1
The following information relates to Lancashire Manufacturing: To produce a unit of product:
Mixing department 3 minutes per unit
Molding department 5 minutes per unit
Casting department 7 minutes per unit
Finishing department 4 minutes per unit
There is a wait time of 8 minutes before the mixing department begins a batch, 5 minutes between the mixing and molding departments, a move and pre-wait between molding and casting of 10 minutes, and a move and pre-wait between the casting and finishing departments of 12 minutes.
-Refer to Figure 15-1. How long would it take to process the first unit of a 20-unit batch under a cellular manufacturing setup?
(Multiple Choice)
4.9/5
(36)
The quantitative assessment of productivity changes is called:
(Multiple Choice)
4.9/5
(24)
If a facility has costs of $100,000 per year and 20,000 square feet, and if 19,000 square feet are absorbed by the value streams, what happens to the unabsorbed cost of the remaining 1,000 feet?
(Multiple Choice)
4.7/5
(38)
Which of the following is an example of an operational performance measure on a box scorecard?
(Multiple Choice)
4.7/5
(32)
Information about Haulover Company is as follows:
What is the partial operational productivity measure for labor for 2014?

(Multiple Choice)
4.9/5
(39)
The productivity measure(s) in which inputs and outputs are expressed in dollars is(are) called:
(Multiple Choice)
4.9/5
(35)
Allocating efficiency chooses the least costly, technically efficient combination of inputs.
(True/False)
4.8/5
(46)
Which of the following is NOT a limitation of a value stream cost assignment?
(Multiple Choice)
4.9/5
(28)
In the calculation of product costs for value streams with multiple products, units shipped instead of units produced is used as the denominator because
(Multiple Choice)
4.9/5
(33)
There are two basic types of non-value added activities. They are
(Multiple Choice)
4.7/5
(38)
The ratio that measures productive efficiency for one input is called:
(Multiple Choice)
4.8/5
(50)
The measure of input and output used by an operational productivity measure is called:
(Multiple Choice)
4.9/5
(30)
At the end of 2014, Diatomic Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2015, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows: 

(Multiple Choice)
4.9/5
(36)
Showing 81 - 100 of 161
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)