Multiple Choice
The following network is the basis for the next four questions:
-Assume all activities are scheduled to begin on their early start times. Circle the letter of each activity that has free float.
A) A
B) B
C) C
D) D
E) E
F) F
G) G
Correct Answer:

Verified
Correct Answer:
Verified