A net-change MRP is one that involves periodically updating all aspects of an MRP system.

(True/False)
4.8/5
(42)

Load reports compare planned capacity requirements with projected capacity and availability.

(True/False)
4.8/5
(34)

Which is true of a net-change MRP?

(Multiple Choice)
4.9/5
(34)

Given the following data,construct a material requirements plan which will result in 100 units of Parent #1 (P1)at the beginning of week 6,and 200 units of Parent #2 (P2)at the beginning of week 8: 11eab92b_c482_30a5_99e6_39a91fdebcbe

(Essay)
4.9/5
(38)

The gross requirements of a given part or component are determined from:

(Multiple Choice)
4.9/5
(41)

Pegging is used primarily for which one of the following purposes?

(Multiple Choice)
4.8/5
(35)

Gross requirements for components are equal to the gross requirements of their immediate parent multiplied by the quantity per parent.

(True/False)
4.9/5
(40)

Safety time is sometimes used in MRP rather than safety stock.

(True/False)
4.9/5
(32)

Independent demand tends to be ___________,while dependent demand tends to be __________.

(Multiple Choice)
4.8/5
(41)

Which of these products and services would be most likely to have dependent demand?

(Multiple Choice)
4.9/5
(31)

A bill of material contains a listing of all the raw materials,parts,and subassemblies needed to produce one unit of an end item.

(True/False)
4.8/5
(40)

ERP packages are intended to fit established ways of doing business,but some modifications to business processes or the ERP software are typically required.

(True/False)
4.8/5
(41)

Great Product,Ltd.has just received an order for 100 Whozats,which must be ready for delivery at the start of week six.An MRP planner has prepared the following table showing product structure,lead times (orders are lot-for-lot),and quantities on hand: Great Product,Ltd.has just received an order for 100 Whozats,which must be ready for delivery at the start of week six.An MRP planner has prepared the following table showing product structure,lead times (orders are lot-for-lot),and quantities on hand:   What is the net requirement for Whatzats to fill this order? What is the net requirement for Whatzats to fill this order?

(Multiple Choice)
4.9/5
(38)

Dependent demand tends to be intermittent,whereas independent demand tends to be more stable.

(True/False)
4.9/5
(34)

Independent demand tends to be more sporadic or "lumpy" than dependent demand.

(True/False)
4.8/5
(44)

Under fixed-interval lot sizing,order sizes for component parts are determined based on which one of the following?

(Multiple Choice)
4.8/5
(38)

The hierarchical diagram that depicts the subassemblies and components that are needed to produce and/or assemble a product is called a(n):

(Multiple Choice)
5.0/5
(44)

Given an order cost of $100,a,per period holding cost of $.50,and the following requirements schedule: Given an order cost of $100,a,per period holding cost of $.50,and the following requirements schedule:   If the firm is using lot size for a fixed period of two,what is the order size for the first order? If the firm is using lot size for a fixed period of two,what is the order size for the first order?

(Multiple Choice)
4.9/5
(40)