Exam 20: Material Requirements Planning and Enterprise Resource Planning
Exam 1: Introduction to Operations Management80 Questions
Exam 2: Competitiveness, strategic Planning, and Productivity62 Questions
Exam 3: Demand Forecasting171 Questions
Exam 4: Product Design103 Questions
Exam 5: Reliability63 Questions
Exam 6: Strategic Capacity Planning75 Questions
Exam 7: Decision Analysis70 Questions
Exam 8: Process Design and Facility Layout169 Questions
Exam 9: Linear Programming98 Questions
Exam 10: Workjob Design147 Questions
Exam 11: Learning Curves67 Questions
Exam 12: Location Planning and Analysis69 Questions
Exam 13: the Transportation Model18 Questions
Exam 14: Management of Quality112 Questions
Exam 15: Statistical Quality Control132 Questions
Exam 16: Acceptance Sampling64 Questions
Exam 17: Supply Chain Management103 Questions
Exam 18: Inventory Management157 Questions
Exam 19: Aggregate Operations Planning and Master Scheduling73 Questions
Exam 20: Material Requirements Planning and Enterprise Resource Planning78 Questions
Exam 21: Just-In-Time and Lean Production89 Questions
Exam 22: Maintenance27 Questions
Exam 23: Job and Staff Scheduling116 Questions
Exam 24: Project Management131 Questions
Exam 25: Waiting-Line Analysis79 Questions
Exam 26: Simulation44 Questions
Select questions type
Budget overruns when implementing ERP systems are typically caused by:
(Multiple Choice)
4.9/5
(36)
Which one of the following most closely describes the MRP approach that is used for components or subassemblies to compensate for variations in lead time?
(Multiple Choice)
4.9/5
(37)
Which action would not be undertaken if capacity requirements planning (CRP)indicate one or more work stations are projected to be under loaded or over loaded?
(Multiple Choice)
4.9/5
(32)
In MRP processing the difference between a planned-order release and the planned-order receipt is:
(Multiple Choice)
4.9/5
(35)
A report that compares known and expected future capacity requirements with projected available capacity is a:
(Multiple Choice)
4.9/5
(38)
Fixed-interval ordering in MRP places orders that cover a predetermined number of periods.
(True/False)
4.8/5
(29)
The development and application of MRP is primarily associated with two developments: (1)managers recognizing the need to differentiate between independent and dependent demand,and (2)___________.
(Multiple Choice)
4.8/5
(28)
The master production schedule (MPS)states which product components are to be produced.
(True/False)
4.9/5
(38)
The master production schedule (MPS)states which end items are to be produced.
(True/False)
4.8/5
(32)
The emergence of ERP systems was primarily because they are less complex to use than MRP systems.
(True/False)
4.9/5
(37)
The three basic inputs of MRP are: 1)the bill of material; 2)inventory on hand,open orders and lead times; and 3)planned order releases.
(True/False)
4.9/5
(38)
Which of the following are not primary reports provided by MRP systems?
(Multiple Choice)
4.9/5
(42)
MRP II involves an expanded approach to production planning and scheduling than MRP.
(True/False)
4.7/5
(40)
Given an order cost of $100,a,per period holding cost of $.50,and the following requirements schedule:
For which period will the second order be submitted using the part period lot sizing method?

(Multiple Choice)
4.9/5
(37)
For a given component in an MRP plan,under lot-for-lot ordering,planned order sizes are equal to net requirements.
(True/False)
4.7/5
(29)
The following is a list of components required to produce one unit of end item P:
P: 2 A's,3 B's,3 C's
A: 5 M's,2 R's
B: 1 D,3 N's.
C: 1 T,4 N's
M: 1 N
Determine the number of N's that will be needed to make 60 P's in each of these cases:
(i)There are currently 10 P's on hand.
(ii)On-hand inventory consists of 15 P's,10A's,20 B's,10 C's,100 N's,300 T's,and 200 M's.
(Essay)
4.8/5
(38)
The input used in MRP that lists the assemblies,subassemblies,parts,and raw materials needed to produce one unit of finished product is the:
(Multiple Choice)
4.8/5
(37)
The MRP approach that immediately updates only those records directly affected by a change is referred to as a(n):
(Multiple Choice)
4.9/5
(38)
MRP usually involves inventory items that have independent demand.
(True/False)
4.8/5
(35)