Exam 10: Lean Systems and Six-Sigma Quality

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The role of management in an organization that practices a lean philosophy is:

(Multiple Choice)
4.9/5
(35)

Lean organizations typically have strict hierarchical management structures.

(True/False)
4.9/5
(34)

In a lean philosophy, all process are driven by the goal to:

(Multiple Choice)
4.9/5
(43)

Lean emphasizes __________ solutions to supply chain problems:

(Multiple Choice)
4.9/5
(42)

The goal of Six Sigma is to achieve "zero defects."

(True/False)
4.9/5
(40)

Of the three elements of lean, lean production focuses on:

(Multiple Choice)
4.8/5
(33)

In a ________ production system, products are made in anticipation of demand.

(Multiple Choice)
4.8/5
(40)

Outcomes of implementing a lean philosophy in an organization include:

(Multiple Choice)
4.9/5
(37)

A Six Sigma philosophy includes the following:

(Multiple Choice)
4.8/5
(35)

A pareto analysis is a quality tool used to prioritize problems.

(True/False)
4.8/5
(34)

in Statistical Quality Control (SQC), ________ determines whether a batch of goods should be accepted or rejected:

(Multiple Choice)
4.9/5
(29)

Core tenets of the lean philosophy include:

(Multiple Choice)
4.9/5
(37)

In the lean philosophy, all processes are driven by the overriding goal to reduce costs.

(True/False)
4.8/5
(45)

Variation that can be identified and managed is knows as common variation.

(True/False)
4.9/5
(41)

"Leveling" the production schedule reduces variation in the production process.

(True/False)
4.8/5
(26)

Lean production utilizes a "push" production system.

(True/False)
4.8/5
(33)

Visual signals used in lean production systems are known as kanbans.

(True/False)
4.9/5
(41)

The tool used to measure a process whose characteristics consist of attributes is knows as:

(Multiple Choice)
4.9/5
(35)

The 'lean production' element of lean is responsible for a company's operations and delivery system.

(True/False)
4.8/5
(42)

Small lot size production must be balanced with the costs of ___________:

(Multiple Choice)
4.8/5
(28)
Showing 41 - 60 of 63
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)