Exam 14: Project Closeout and Termination
Exam 1: Introduction: Why Project Management88 Questions
Exam 2: The Organizational Context: Strategy, Structure, and Culture90 Questions
Exam 3: Project Selection and Portfolio Management95 Questions
Exam 4: Leadership and the Project Manager108 Questions
Exam 5: Scope Management96 Questions
Exam 6: Project Team Building, Conflict, and Negotiation104 Questions
Exam 7: Risk Management95 Questions
Exam 8: Cost Estimation and Budgeting95 Questions
Exam 9: Project Scheduling: Networks, Duration Estimation, and Critical Path98 Questions
Exam 10: Project Scheduling: Lagging, Crashing, and Activity Networks90 Questions
Exam 11: Critical Chain Project Scheduling98 Questions
Exam 12: Resource Management79 Questions
Exam 13: Project Evaluation and Control98 Questions
Exam 14: Project Closeout and Termination100 Questions
Select questions type
At a minimum, a project assessment system should specify the __________, the __________, and the __________.
(Short Answer)
4.8/5
(38)
Closeout activities are typically among the highest priority activities in a project.
(True/False)
4.9/5
(49)
Which of these is NOT a sign of pending IT project failure?
(Multiple Choice)
5.0/5
(41)
A classic early warning sign of project failure is the realization that a product being developed was targeting a market that few new products and firms were entering.
(True/False)
4.9/5
(33)
What is the key to begin harvesting the benefits of a project? What are the major components of a meaningful project assessment system and how does an assessment system help the project organization?
(Essay)
4.9/5
(45)
A project that is terminated by extinction is not completed successfully.
(True/False)
5.0/5
(37)
A static factor that may lead to early termination for a project is:
(Multiple Choice)
4.9/5
(35)
The Microserf was in a blind panic; now that the latest version of the Bob operating system was ready for sale he would have to latch onto a new project team or face life on the mean streets of Redmond. This is indubitably an:
(Multiple Choice)
4.9/5
(39)
What are three different ways that a project can be handed over from the project organization to the client? Describe their differences.
(Essay)
4.8/5
(33)
The project contractor takes initial ownership of the project for a specified period under a(n) __________ contract.
(Short Answer)
4.9/5
(34)
A successful project that also creates a need for a change to organizational structure is probably terminated by:
(Multiple Choice)
4.9/5
(38)
Projects accumulate quantities of unused supplies and materials. It is imperative that an organization have a method for disposing of these materials when a project is terminated. This issue is:
(Multiple Choice)
4.8/5
(42)
Research clearly indicates that when team members have experienced positive psycho-social outcomes from a project:
(Multiple Choice)
4.9/5
(45)
A significant challenge during the finishing the work element of project closeout management is to:
(Multiple Choice)
4.7/5
(41)
Surveys on the early warning signs of project failure indicate that a red flag for failure is:
(Multiple Choice)
4.7/5
(39)
The rapid evolution of technology and the need to freeze a project's scope can combine to render a project:
(Multiple Choice)
4.7/5
(33)
It is important to fix the problem, not the __________ during a lesson-learned meeting.
(Short Answer)
4.8/5
(47)
A behavioral issue that is crucial to maintaining the ongoing viability of a project is:
(Multiple Choice)
4.8/5
(40)
Showing 81 - 100 of 100