Given the following information,compute the efficiency of the system. Actual capacity = 80 units per day Design capacity = 100 units per day Utilization = 48%

(Multiple Choice)
4.8/5
(37)

In the level SOP production plan,variations in demand from period to period are met by

(Multiple Choice)
4.8/5
(47)

Given the following information,compute the capacity utilization of the system. Actual capacity = 30 units per day Design capacity = 50 units per day Actual output = 20 units per day

(Multiple Choice)
4.7/5
(20)

Demand that is calculated from the requirements for some parent item is called independent demand.

(True/False)
4.8/5
(37)

A data file that shows how a product is manufactured,including what components are used in the manufacture of the finished product with required quantities,is the

(Multiple Choice)
4.8/5
(44)

The element of the MRP record which is the quantity that has already been ordered and will be received at the beginning of the period is called ________.

(Short Answer)
4.8/5
(25)

In yield management,the mechanism used to match capacity with demand is by

(Multiple Choice)
4.8/5
(42)

Creating a high-level plan,which involves groups or families of products,is called

(Multiple Choice)
4.8/5
(31)

The feasibility check of a Master Production Schedule (MPS)is the aggregate capacity plan.

(True/False)
4.8/5
(36)

A planning strategy that produces the exact amount demanded in each period is known as

(Multiple Choice)
5.0/5
(38)

The feasibility check of a Master Production Schedule (MPS)is

(Multiple Choice)
4.9/5
(32)

Using cloud-based ERP systems provide the advantage that data is accessible from any location or any device.

(True/False)
4.8/5
(38)

The typical time horizon for production activity control and purchasing is

(Multiple Choice)
4.9/5
(30)

The element of the MRP record which is the quantity required for an item at the end of each period to meet customer requirements is called

(Multiple Choice)
4.9/5
(28)

Items that occur at higher levels in a bill of materials are called ________.

(Short Answer)
4.8/5
(26)

The element of the MRP record which is the amount of an item required to satisfy gross requirements after taking scheduled receipts and projected inventory into account is called ________.

(Short Answer)
4.9/5
(33)

The typical time horizon for Materials Requirements Planning (MRP)is

(Multiple Choice)
4.8/5
(37)

A method for planning capacity on a daily basis is known as ________.

(Short Answer)
4.7/5
(44)

The typical time horizon for developing a Master Production Schedule (MPS)is

(Multiple Choice)
4.8/5
(43)

The ratio of actual output to actual capacity is called ________.

(Short Answer)
4.7/5
(22)