Exam 6: Processes and Technology
Exam 1: Introduction to Operations and Supply Chain Management102 Questions
Exam 2: Quality Management88 Questions
Exam 3: Statistical Process Control157 Questions
Exam 4: Product Design95 Questions
Exam 5: Service Design91 Questions
Exam 6: Processes and Technology81 Questions
Exam 7: Capacity and Facilities Design128 Questions
Exam 8: Human Resources131 Questions
Exam 9: Project Management106 Questions
Exam 10: Supply Chain Management Strategy and Design72 Questions
Exam 11: Global Supply Chain Procurement and Distribution122 Questions
Exam 12: Forecasting92 Questions
Exam 13: Inventory Management127 Questions
Exam 14: Sales and Operations Planning123 Questions
Exam 15: Resource Planning97 Questions
Exam 16: Lean Systems88 Questions
Exam 17: Scheduling96 Questions
Select questions type
One characteristic of batch production is variable demand.
Free
(True/False)
4.9/5
(32)
Correct Answer:
True
The product-process matrix includes all the following process types except
Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
B
Which of the following is not associated with the sourcing continuum?
Free
(Multiple Choice)
4.7/5
(31)
Correct Answer:
B
Steel, paper, paints, and chemicals are examples of products that use
(Multiple Choice)
4.9/5
(41)
Batch production is also known as a job shop because it creates more jobs than any of the other process choices.
(True/False)
5.0/5
(40)
Companies that control the production of virtually all of the parts that go into a product are said to be horizontally integrated.
(True/False)
4.9/5
(32)
Most of the operations in batch production involve assembly rather than fabrication.
(True/False)
4.8/5
(33)
A company is considering producing an item that can be sold for $37.50 per unit. If the fixed costs for setting up production are $225,000 and the variable cost per unit for the item is $35.00 then the break-even volume for this item is
(Multiple Choice)
4.9/5
(41)
Customers are rarely involved in a project that takes an extended period of time to complete.
(True/False)
4.9/5
(34)
Producing a high volume of a single product is a characteristic of batch production.
(True/False)
4.7/5
(40)
Mass production is characterized by the use of specialized equipment and workers with limited skills.
(True/False)
4.9/5
(30)
Batch production is characterized by small volumes and high product variety.
(True/False)
4.8/5
(28)
Process planning determines how a manufactured good is produced or a service is provided.
(True/False)
4.9/5
(30)
Complex scheduling problems are most likely to occur with which process type?
(Multiple Choice)
4.9/5
(37)
In general, processes should be analyzed for continuous improvement only after a breakthrough improvement.
(True/False)
4.8/5
(33)
A company is evaluating which of two alternatives should be used to produce a product that will sell for $35.00 per unit. The following cost information describes the two alternatives:
The break-even volume for Process B is

(Multiple Choice)
4.8/5
(36)
Outsourcing occurs when a company cannot or will not make all the parts that go into a product.
(True/False)
4.7/5
(36)
The basic tools of process analysis include process flowcharts, diagrams, and maps.
(True/False)
4.8/5
(33)
The following are techniques for generating innovative ideas except for
(Multiple Choice)
4.7/5
(31)
A process flowchart is a useful tool for analyzing a process because it often highlights non-productive activities.
(True/False)
4.8/5
(41)
Showing 1 - 20 of 81
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)