Exam 14: Jit and Lean Operations
Exam 1: Introduction to Operations Management78 Questions
Exam 2: Competitiveness, Strategy, and Productivity75 Questions
Exam 3: Forecasting144 Questions
Exam 4: Product and Service Design100 Questions
Exam 5: Strategic Capacity Planning for Products and Services210 Questions
Exam 6: Process Selection and Facility Layout137 Questions
Exam 7: Work Design and Measurement200 Questions
Exam 8: Location Planning and Analysis65 Questions
Exam 9: Management of Quality101 Questions
Exam 10: Quality Control117 Questions
Exam 11: Aggregate Planning and Master Scheduling80 Questions
Exam 12: Inventory Management134 Questions
Exam 13: MRP and ERP85 Questions
Exam 14: Jit and Lean Operations126 Questions
Exam 15: Supply Chain Management91 Questions
Exam 16: Scheduling102 Questions
Exam 17: Project Management118 Questions
Exam 18: Management of Waiting Lines68 Questions
Exam 19: Linear Programming98 Questions
Select questions type
Which of the following would not improve the performance of a breakdown program?
(Multiple Choice)
5.0/5
(38)
Breakdown programs often are prioritized such that some equipment gets a lot of attention and other equipment gets very little. This typically reflects the fact that breakdowns are consistent with
(Multiple Choice)
4.8/5
(32)
In lean operations, when work is completed at one work center, it is important to immediately move the completed work to the next work center to minimize idle time.
(True/False)
4.8/5
(40)
The term that refers to the automatic detection of defects is
(Multiple Choice)
4.8/5
(33)
A common objective of both MRP and the lean philosophy is to
(Multiple Choice)
4.9/5
(42)
Which of the following is not commonly found in lean systems?
(Multiple Choice)
4.8/5
(34)
Which of the following is characteristic of the lean philosophy?
(Multiple Choice)
4.9/5
(31)
The total maintenance cost curve (preventive maintenance cost plus breakdown and repair cost)
(Multiple Choice)
4.8/5
(31)
_____ is known as being a reactive approach to maintenance.
(Multiple Choice)
4.9/5
(36)
Degree of technology is a factor affecting the decision of how much preventive maintenance is desirable.
(True/False)
4.8/5
(32)
In the Toyota Production System, waste and inefficiency are referred to as __________, and the ongoing effort to reduce this is referred to as __________.
(Multiple Choice)
4.8/5
(33)
Limited WIP lowers inventory carrying costs but reduces flexibility.
(True/False)
4.9/5
(30)
Maintenance activities are often organized into the following two groups
(Multiple Choice)
4.9/5
(40)
Before lean approaches could be implemented successfully, many North American companies needed to make which changes?
(Multiple Choice)
4.8/5
(30)
Although lean systems tend to produce standardized product lines, to provide production variety without accompanying waste, lean producers often use __________ in __________.
(Multiple Choice)
4.8/5
(34)
Showing 101 - 120 of 126
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)