Exam 14: Jit and Lean Operations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

With regard to suppliers, lean systems typically require

(Multiple Choice)
4.8/5
(29)

_____ is known as being a proactive approach to maintenance.

(Multiple Choice)
4.8/5
(31)

Setup time and its associated cost can often be reduced by the use of group technology.

(True/False)
4.8/5
(30)

Which of the following is not a risk of lean systems?

(Multiple Choice)
4.8/5
(25)

The average time before breakdown of a machine is normally distributed and has a mean of 18 weeks and a standard deviation of three weeks. If breakdown cost averages $2,000 and preventive maintenance costs $1,400, what is the optimal preventive maintenance interval?

(Multiple Choice)
4.8/5
(39)

Increased setup times generally require increased work-in-process inventories.

(True/False)
4.8/5
(36)

What is a highly coordinated activity that delivers goods and/or services when they are needed?

(Multiple Choice)
4.8/5
(29)

Suppose that the average time before breakdown is normally distributed with a mean of 2.5 weeks and a standard deviation of .4 weeks. If breakdowns cost an average of $1,200 and preventive maintenance costs $800, what is the optimal maintenance interval?

(Multiple Choice)
4.8/5
(41)

The ultimate goal of lean operations is a system characterized by the smooth, rapid flow of materials.

(True/False)
4.9/5
(38)

The lean philosophy recognizes that some work-in-process inventories are a necessary investment to allow for smooth work flow.

(True/False)
4.9/5
(31)

A real advantage of the lean philosophy is the reduction of coordination effort required with supply chain partners.

(True/False)
5.0/5
(42)

How many wastes (muda)are there in lean philosophy?

(Multiple Choice)
4.9/5
(36)

A goal of lean operations is to produce output using fewer resources than traditional planning systems.

(True/False)
4.8/5
(33)

Which of the following is not a principle regarding the way lean systems function? Identifying customer valuesfocusing on processes that create valueelimination of waste to create flowincreasing forecast accuracyproducing only according to customer demandoptimizing on setup costs with long production runsstriving for perfection

(Multiple Choice)
4.8/5
(42)

In the lean philosophy, the ideal lot size is

(Multiple Choice)
4.9/5
(33)

Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following except

(Multiple Choice)
4.7/5
(42)

In the area of maintenance, the Pareto phenomenon is reflected in the fact that, regardless of problem classification, all equipment will justify about the same expense.

(True/False)
4.8/5
(33)

The Five S's do not include

(Multiple Choice)
4.9/5
(40)

Which of the following is the primary consideration with regard to preventive maintenance?

(Multiple Choice)
5.0/5
(40)

Preventive maintenance is additional maintenance done immediately after a breakdown has occurred to help prevent any further breakdowns.

(True/False)
4.9/5
(32)
Showing 21 - 40 of 126
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)