Exam 10: Comprehensive Provisions
Exam 1: Introduction to the National Electrical Code13 Questions
Exam 2: Definitions25 Questions
Exam 3: Boxes and Enclosures25 Questions
Exam 4: Cables17 Questions
Exam 5: Raceways and Conductors26 Questions
Exam 6: General Provisions25 Questions
Exam 7: Specific Provisions25 Questions
Exam 8: Load Calculations25 Questions
Exam 9: Services and Electrical Equipment27 Questions
Exam 10: Comprehensive Provisions25 Questions
Exam 11: Load Calculations14 Questions
Exam 12: General Provisions25 Questions
Exam 13: Nondwelling Load Calculations19 Questions
Exam 14: Services, Feeders, and Equipment25 Questions
Exam 15: Hazardous Classified Locations25 Questions
Exam 16: Health Care25 Questions
Exam 17: Industrial Locations25 Questions
Exam 18: Special Occupancies25 Questions
Exam 19: Specific Equipment25 Questions
Select questions type
The conductors and equipment that deliver energy from the electricity supply system to the wiring system of the premises are called the ____.
(Multiple Choice)
4.7/5
(36)
If the load requirements of a single-phase installation are greater than the serving agency normally supplies through one service, ____ are permitted.
(Multiple Choice)
4.8/5
(37)
____ is defined as the underground conductors between the utility electric supply system and the service point.
(Multiple Choice)
4.9/5
(36)
If each feeder is 100 amperes, the minimum conductor size is ____.
(Multiple Choice)
4.8/5
(44)
Showing 21 - 25 of 25
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)