Exam 5: Systems Analysis
Exam 1: The Context of Systems Analysis and Design Methods130 Questions
Exam 2: Information System Building Blocks81 Questions
Exam 3: Information Systems Development113 Questions
Exam 4: Project Management97 Questions
Exam 5: Systems Analysis161 Questions
Exam 6: Fact-Finding Techniques for Requirements Discovery166 Questions
Exam 7: Modeling System Requirements With Use Cases75 Questions
Exam 8: Data Modeling and Analysis173 Questions
Exam 9: Process Modeling231 Questions
Exam 10: Object-Oriented Analysis and Modeling Using the Uml125 Questions
Exam 11: Feasibility Analysis and the System Proposal149 Questions
Exam 12: Systems Design120 Questions
Exam 13: Application Architecture and Modeling170 Questions
Exam 14: Database Design268 Questions
Exam 15: Output Design and Prototyping101 Questions
Exam 16: Input Design and Prototyping148 Questions
Exam 17: User Interface Design75 Questions
Exam 18: Object-Oriented Design and Modeling Using the UML100 Questions
Exam 19: Systems Construction and Implementation60 Questions
Exam 20: Systems Operations and Support63 Questions
Select questions type
Interpersonal and communication skills are critical to the problem analysis phase.
(True/False)
4.8/5
(45)
Structured analysis is a traditional approach to system analysis and design.
(True/False)
4.7/5
(38)
A _________________________________ is a description of other features, characteristics and constraints that define a satisfactory system.
(Short Answer)
4.8/5
(30)
In the scope definition phase, a consensus of priorities is arrived at to help adjust the project scope.
(True/False)
4.8/5
(42)
The project plan needs to be updated during what phase of the systems development life cycle?
(Multiple Choice)
4.8/5
(29)
A desirable requirement is one that is not essential to the first version of the system, but may still be essential to the vision of some future version.
(True/False)
4.9/5
(28)
The logical design phase further documents business requirements.
(True/False)
4.9/5
(37)
The final deliverable for the scope definition phases is the project charter..
(True/False)
4.9/5
(38)
The Unified Modeling Language (UML) is used in information engineering.
(True/False)
4.8/5
(36)
Analytical discovery includes those techniques to be used by a systems analyst to identify or extract system problems and solution requirements from the user community.
(True/False)
4.8/5
(38)
The deliverables of the requirements analysis phase are the draft functional and non-functional requirements.
(True/False)
4.8/5
(36)
A _________________ requirement is one that does not have to be included in version 1.0.
(Short Answer)
4.8/5
(41)
A description of features, characteristics, and constraints that define a satisfactory system, but are not required in the initial version of the system is known as:
(Multiple Choice)
4.8/5
(36)
One of three possible decisions are made at the end of the problem analysis phase: (1) authorize the project to continue to the next phase (requirements analysis); (2) adjust the scope, cost and/or schedule for the project, and then continue with the next phase (requirements analysis); OR (3) cancel the project due to either the lack of resources or the realization that the problems and opportunities are not simply as important as anticipated.
(True/False)
4.8/5
(38)
Objected oriented analysis (OOA) is model-driven technique that integrates Data and Process concerns into constructs called Objects. OOA models are pictures that illustrate the system's objects from various perspectives such as structure and behavior.
(True/False)
4.9/5
(35)
One approach to logical design is to structure __________________________ solutions.
(Short Answer)
4.8/5
(27)
The requirements analysis phase comes after the problem analysis phase and defines the business requirements for a new system.
(True/False)
4.7/5
(35)
Showing 81 - 100 of 161
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)