Exam 5: Systems Analysis
Exam 1: The Context of Systems Analysis and Design Methods130 Questions
Exam 2: Information System Building Blocks81 Questions
Exam 3: Information Systems Development113 Questions
Exam 4: Project Management97 Questions
Exam 5: Systems Analysis161 Questions
Exam 6: Fact-Finding Techniques for Requirements Discovery166 Questions
Exam 7: Modeling System Requirements With Use Cases75 Questions
Exam 8: Data Modeling and Analysis173 Questions
Exam 9: Process Modeling231 Questions
Exam 10: Object-Oriented Analysis and Modeling Using the Uml125 Questions
Exam 11: Feasibility Analysis and the System Proposal149 Questions
Exam 12: Systems Design120 Questions
Exam 13: Application Architecture and Modeling170 Questions
Exam 14: Database Design268 Questions
Exam 15: Output Design and Prototyping101 Questions
Exam 16: Input Design and Prototyping148 Questions
Exam 17: User Interface Design75 Questions
Exam 18: Object-Oriented Design and Modeling Using the UML100 Questions
Exam 19: Systems Construction and Implementation60 Questions
Exam 20: Systems Operations and Support63 Questions
Select questions type
A nonfunctional requirement is a description of other features, characteristics and constraints that define a satisfactory system.
(True/False)
4.7/5
(38)
__________________________ defines the boundary of the project - those aspects of the business that will and will not be included. Scope can change during the life cycle of a project, however, the initial project plan needs to establish the preliminary scope to provide a context for the budget and schedule.
(Short Answer)
4.9/5
(42)
The feasibility analysis should be stopped as soon as the analyst identifies an ideal solution. This will save valuable time that can be put to better use during the implementation phase.
(True/False)
4.9/5
(32)
A __________________________________ defines the project scope, plan, methodology, and standards for a project. It is the first major milestone.
(Short Answer)
4.8/5
(36)
The requirements analysis phase answers the question, "What do the users need and want from a new system?"
(True/False)
4.9/5
(27)
A mandatory requirement is one that is essential for the system, but not necessaryily for the first version of the system.
(True/False)
4.8/5
(30)
In the future, with the improvement of CASE tools, we will no longer need systems analysts to investigate business problems; the procedure will be completely automated.
(True/False)
4.9/5
(33)
Cause-and-effect analysis is an out-of-date technique that is unnecessary today given the complete nature of the scope definition phase that makes such problems and their solutions obvious.
(True/False)
4.9/5
(35)
The study of a current business and information system application and the definition of user requirements and priorities for a new or improved information system is part of which phase?
(Multiple Choice)
4.9/5
(39)
The PIECES framework can be used to categorize problems, opportunities, directives, and constraints.
(True/False)
4.9/5
(33)
Requirements discovery is the process of identifying system problems and solution requirements from the user community.
(True/False)
4.8/5
(38)
____________________________________ technology reads the program code for an existing database, application program, and/or user interface and automatically generates the equivalent system model.
(Short Answer)
4.9/5
(37)
Systems design is a complementary problem solving technique to systems analysis that reassembles a system's component pieces into a (hopefully improved) complete system.
(True/False)
4.9/5
(27)
Business process redesign is often applied within the context of information systems development when the projects include a study of existing business processes to identify problems, bureaucracy and inefficiencies that need to be addressed in requirements for new and improved information systems.
(True/False)
4.7/5
(40)
CASE tools offer the advantage of consistency and completeness analysis as well as rule-based error checking.
(True/False)
4.7/5
(42)
The _____________________________phase typically includes the following tasks: (1) study the problem domain; (2) analyze problems and opportunities; (3) analyze business processes; (4) establish system improvement objectives; (5) update the project plan; (6) present findings and recommendations.
(Short Answer)
4.7/5
(32)
An agile method integrates various approaches of systems analysis and design..
(True/False)
4.9/5
(39)
Cause-and-effect analysis leads to true understanding of problems and can lead to not-so-obvious, but more creative and valuable solutions.
(True/False)
4.9/5
(44)
Showing 141 - 160 of 161
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)