Exam 5: Systems Analysis
Exam 1: The Context of Systems Analysis and Design Methods130 Questions
Exam 2: Information System Building Blocks81 Questions
Exam 3: Information Systems Development113 Questions
Exam 4: Project Management97 Questions
Exam 5: Systems Analysis161 Questions
Exam 6: Fact-Finding Techniques for Requirements Discovery166 Questions
Exam 7: Modeling System Requirements With Use Cases75 Questions
Exam 8: Data Modeling and Analysis173 Questions
Exam 9: Process Modeling231 Questions
Exam 10: Object-Oriented Analysis and Modeling Using the Uml125 Questions
Exam 11: Feasibility Analysis and the System Proposal149 Questions
Exam 12: Systems Design120 Questions
Exam 13: Application Architecture and Modeling170 Questions
Exam 14: Database Design268 Questions
Exam 15: Output Design and Prototyping101 Questions
Exam 16: Input Design and Prototyping148 Questions
Exam 17: User Interface Design75 Questions
Exam 18: Object-Oriented Design and Modeling Using the UML100 Questions
Exam 19: Systems Construction and Implementation60 Questions
Exam 20: Systems Operations and Support63 Questions
Select questions type
The deliverable for the ______________________________ phase is the completion of an updated project plan, including problem analyses, any system models, the system improvement objectives, and any other documentation that was produced during this phase.
(Short Answer)
4.9/5
(38)
In the scope definition phase, urgency is used to represent the prioritization and documentation requirements for the problem that needs to be solved, or the opportunity or directive to be realized.
(True/False)
4.8/5
(33)
Which of the following phases defines the business requirements for new systems?
(Multiple Choice)
4.8/5
(36)
A small-scale, incomplete, but working sample of a desired system is:
(Multiple Choice)
4.8/5
(40)
________________________________ techniques use facilitated workshops to bring together all the system owners, system users, systems analysts and some systems designers and builders to jointly perform systems analysis.
(Short Answer)
4.8/5
(32)
A nonfunctional requirement is a description of other features, characteristics and constraints that will make the system unsatisfactory.
(True/False)
4.8/5
(28)
Which of the following is not part of the scope definition phase?
(Multiple Choice)
4.9/5
(38)
A(n) __________________________________ is a committee of executive business and system managers that studies and prioritizes competing project proposals to determine which projects will return the most value to the organization and thus should be approved for continued system development.
(Short Answer)
4.7/5
(32)
The requirements phase typically includes a task to update or refine the project plan.
(True/False)
4.9/5
(34)
Many analysts use parts of structured analysis and information engineering in a complementary way to model an information system.
(True/False)
4.8/5
(42)
The _____________________________phase is best described by the statement, "Don't try to fix it unless you understand it."
(Short Answer)
5.0/5
(29)
In the scope definition phase, _____________________________ is used to represent what time frame the problem needs to be solved or the opportunity or directive to be realized.
(Short Answer)
4.8/5
(37)
During the scope definition phase, each problem, opportunity and directive is assessed with respect to urgency, visibility, tangible benefits and priority.
(True/False)
4.8/5
(31)
Timeboxing divides the total project into subsets that can each be delivered within a one-week time frame.
(True/False)
4.7/5
(37)
The scope definition phase typically included the following tasks: (1) study the problem domain; (2) analyzed problems and opportunities; (3) analyze business processes; (4) establish system improvement objectives; (5) update the project plan; (6) present findings and recommendations.
(True/False)
4.8/5
(46)
The scope definition phase is the first phase of the classic systems development process. It is also known as initial study phase, survey phase, or planning phase.
(True/False)
4.7/5
(30)
The scope definition phase looks at the economic and operational feasibility of the project under consideration.
(True/False)
4.9/5
(36)
Systems analysis is a problem-solving technique that decomposes a system into its component pieces for the purpose of studying how well those component parts work and interact to accomplish their purpose.