Exam 5: Competitive Advantage and Strategic Management for Performance Excellence
Exam 1: Introduction to Quality and Performance Excellence79 Questions
Exam 2: Frameworks for Quality and Performance Excellence80 Questions
Exam 3: Tools and Techniques for Quality Design and Control79 Questions
Exam 4: Tools and Techniques for Quality Improvement79 Questions
Exam 5: Competitive Advantage and Strategic Management for Performance Excellence78 Questions
Exam 6: Quality in Customer Supplier Relationships80 Questions
Exam 7: Designing Organizations for Performance Excellence82 Questions
Exam 8: Quality Teamwork80 Questions
Exam 9: Engagement, Empowerment, and Motivation80 Questions
Exam 10: Leadership for Performance Excellence80 Questions
Exam 11: Performance Excellence and Organizational Change80 Questions
Select questions type
Improved conformance in production leads to lower manufacturing and service costs.
(True/False)
4.8/5
(39)
Having a manufacturing system designed for flexible sequence of operations is a strategy used for cost-leadership for high-volume products.
(True/False)
4.9/5
(28)
A firm purchasing a key supplier to strengthen its value chain is an example of _____.
(Multiple Choice)
4.9/5
(35)
The ability of a car to start consistently in all types of weather and the lack of failure of electronic components is an example of the _____ dimension of product design.
(Multiple Choice)
4.9/5
(28)
_____ refers to a firm's ability to achieve market superiority over its competitors.
(Multiple Choice)
4.9/5
(44)
The _____ is a tool for organizing a large number of ideas, opinions, and facts relating to a broad problem or subject area.
(Multiple Choice)
4.8/5
(40)
The competitive advantage resulting from an organization's people can drive low cost and differentiation.
(True/False)
4.8/5
(42)
Durability refers to the probability of a product's surviving over a specified period of time under stated conditions of use.
(True/False)
4.8/5
(37)
Traditional management strategists advocated focusing on a single quality-related dimension.
(True/False)
4.8/5
(38)
List a few quality-related dimensions a business may concentrate on, in order to differentiate itself from its competition.
(Essay)
4.8/5
(36)
In the general hoshin planning process, policy deployment starts with the senior managers of the company.
(True/False)
4.8/5
(31)
Design review is a technique in quality engineering in which formal statistical experiments are applied to determine the best combinations of product and process parameters for high quality and low cost.
(True/False)
4.8/5
(33)
With respect to the dimensions of product design, _____ is the amount of use one gets from a product before it physically deteriorates or until replacement is preferable.
(Multiple Choice)
4.9/5
(44)
With which of the following would Frederick W. Taylor most likely have agreed?
(Multiple Choice)
4.7/5
(25)
Showing 61 - 78 of 78
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)