Exam 19: JIT and Lean Operations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Value stream mapping is a technique focused on finding new ways of adding value for critical stakeholders such as customers.

Free
(True/False)
4.9/5
(34)
Correct Answer:
Verified

False

Managers considering an operations strategy reflecting the lean philosophy of operations should recognize that lean:

Free
(Multiple Choice)
4.8/5
(33)
Correct Answer:
Verified

D

Which of the following contributes to the competitive advantage enjoyed by service firms using lean concepts?

Free
(Multiple Choice)
4.7/5
(41)
Correct Answer:
Verified

E

Preventive maintenance is additional maintenance done immediately after a breakdown has occurred to help prevent any further breakdowns.

(True/False)
4.7/5
(25)

In lean operations, a responsibility of the worker is to check the quality of their work.

(True/False)
4.9/5
(38)

A lean-systems method of asking questions about a process is the __________ approach.

(Multiple Choice)
4.7/5
(40)

A real advantage of the lean philosophy is the reduction of coordination effort required with supply chain partners.

(True/False)
4.9/5
(30)

Lean operations reduce the number of suppliers the organization works with by limiting contacts to two tiers of suppliers.

(True/False)
4.8/5
(38)

With regard to suppliers, lean systems typically require:

(Multiple Choice)
4.9/5
(30)

A system of lights used at each workstation to signal problems or slowdowns is:

(Multiple Choice)
4.8/5
(40)

"Autonomation" indicates that the firm is attempting to reduce its dependence on automated equipment.

(True/False)
4.7/5
(35)

For a company with a product mix of 40 percent of product A and 30 percent each of products B and C, which of the following mixed-model sequences best reflects the lean philosophy?

(Multiple Choice)
4.9/5
(34)

A benefit of small lot sizes in lean systems is that each product is produced less frequently.

(True/False)
4.9/5
(32)

In the Toyota Production System, waste and inefficiency are referred to as __________, and the ongoing effort to reduce this is referred to as __________.

(Multiple Choice)
4.8/5
(37)

A common objective of both MRP and the lean philosophy is to:

(Multiple Choice)
4.9/5
(40)

Which of the following would you not expect to see in a lean environment?

(Multiple Choice)
4.9/5
(40)

Which of the following is not a benefit of small lot sizes in lean systems?

(Multiple Choice)
4.9/5
(34)

Which of the following is not characteristic of preventive maintenance in lean systems?

(Multiple Choice)
4.9/5
(31)

A requirement of lean systems is that lead times are increased, allowing more time for processing.

(True/False)
4.9/5
(39)

In lean operations, when work is completed at one work center, it is important to immediately move the completed work to the next work center to minimize idle time.

(True/False)
4.9/5
(32)
Showing 1 - 20 of 79
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)