Exam 17: MRP and ERP
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness70 Questions
Exam 3: Forecasting139 Questions
Exam 4: Product and Service Design78 Questions
Exam 4: RELIABILITY – Static12 Questions
Exam 6: Strategic Capacity Planning for Products and Services85 Questions
Exam 7: Decision Theory– Static114 Questions
Exam 8: Process Selection and Facility Layout132 Questions
Exam 9: Work Design and Measurement129 Questions
Exam 10: learning curve– Static61 Questions
Exam 11: Location Planning and Analysis62 Questions
Exam 12: The Transportation Model– Static20 Questions
Exam 13: Management of Quality97 Questions
Exam 14: Quality Control112 Questions
Exam 15: Acceptance Sampling– Static51 Questions
Exam 16: Aggregate Planning and Master Scheduling74 Questions
Exam 17: MRP and ERP81 Questions
Exam 18: Inventory Management128 Questions
Exam 19: JIT and Lean Operations79 Questions
Exam 20: Maintenance– Static36 Questions
Exam 21: Supply Chain Management87 Questions
Exam 22: Scheduling98 Questions
Exam 23: Project Management113 Questions
Exam 24: Management of Waiting Lines64 Questions
Exam 25: Linear Programming93 Questions
Select questions type
Lot-for-lot ordering in MRP minimizes holding costs for parts that are carried over to other periods.
Free
(True/False)
4.8/5
(33)
Correct Answer:
True
A computer-based information system designed to handle ordering and scheduling of dependent-demand items is used for:
Free
(Multiple Choice)
4.8/5
(31)
Correct Answer:
D
Load reports show capacity requirements for departments or work centers which may be more or less than the capacity available in that work center.
(True/False)
4.9/5
(34)
The identification of parent items that have generated a given set of material requirements for an item is called:
(Multiple Choice)
4.9/5
(42)
The gross requirements at one level of an MRP plan determine the gross requirements at the next lower level continuing on down to the lowest levels shown on the bill of materials.
(True/False)
4.8/5
(35)
A regenerative MRP system is one that is updated continuously, every time there is a schedule change.
(True/False)
4.9/5
(39)
The term pegging refers to identifying the parent items that have generated a given set of material requirements for a part or subassembly.
(True/False)
4.8/5
(43)
The gross requirements value for any given component is equal to the net requirements of that component's immediate parent multiplied by the quantity per parent.
(True/False)
4.9/5
(39)
An MRP system whose records are updated continuously is referred to as a(n):
(Multiple Choice)
4.9/5
(32)
The bill of materials contains information on lead times and current inventory position on every component required to produce the end item.
(True/False)
4.8/5
(38)
The inventory records contain information on the status of each item by time period.
(True/False)
4.7/5
(37)
MRP II is simply an improved version of MRP that processes more quickly and can plan for a larger number of end items.
(True/False)
4.8/5
(29)
Under lot-for-lot, order sizes for component parts are essentially determined directly from which one of the following?
(Multiple Choice)
4.9/5
(36)
Project management approaches can help in a conversion to an ERP system.
(True/False)
4.7/5
(31)
An effort to expand the scope of material planning by involving other functional areas in the planning process has been:
(Multiple Choice)
4.7/5
(40)
Which of these products would be most likely to have dependent demand?
(Multiple Choice)
4.8/5
(44)