Technological factors exist that do not permit operations to be split.Such physical restrictions are called zoning constraints.

(True/False)
4.7/5
(37)

Which of the following factors is an established cause of unequal total work time assignments at successive workstations?

(Multiple Choice)
4.8/5
(39)

Which of the following heuristics sets the pattern for random generation of feasible sequences?

(Multiple Choice)
4.8/5
(41)

Project management has a similar interpretation of cycle time as the flow shop.

(True/False)
4.8/5
(32)

Viewing a vending machine as a stochastic,single-channel,input-output system with Poisson arrivals and exponential service times,determine the values of Lq and Wq as well as W and L for l = 8 per minute and m = 10 per minute.These rates apply at lunch time when the school cafeteria is filled to capacity.Also,on a technical note: FIFO holds as well as all other assumptions required for the single-channel queuing model.

(Essay)
4.8/5
(43)

From a systems perspective,cycle-time management has trade-offs to consider between longer cycle times using technology and shorter cycle times using people.

(True/False)
4.8/5
(36)

It is easy to increase cycle time significantly without radically changing the factory environment.The same goes for decreasing cycle time.

(True/False)
4.9/5
(44)

With IFS,people are often an important part of the production system.

(True/False)
4.7/5
(39)

Define cycle time and discuss cycle time management.

(Essay)
4.9/5
(29)

The number of workstations n must always be an integer in both theory and practice.

(True/False)
4.8/5
(33)

The overriding objective of line-balancing is

(Multiple Choice)
4.9/5
(38)

An agreement that the buyer makes to purchase a quantity that entitles the buyer to a discount is a JIT release.

(True/False)
4.8/5
(33)

Stochastic line balancing exists when the assumption of fixed and deterministic times for operations and total process time is not correct.

(True/False)
4.9/5
(29)

Engineering design will be the preferred method for line-balancing

(Multiple Choice)
4.9/5
(36)

At The Burger Place,Jane's toaster produces 20 finished crowns and heels per minute while Jim dresses 10 burgers per minute.They have been trained to use push-production methods.When Jane sees that Jim has no more space,she helps out at the drive-through window.What is the waiting line if they both work at rated speed for 15 minutes? How big a storage space does Jim need? How is quality affected?

(Essay)
4.9/5
(33)

Tonge's heuristic develops a learning procedure that rewards success and penalizes failure by always increasing the probability of selecting a good heuristic from a catalog of heuristics.

(True/False)
4.9/5
(39)

Which of the following is the first to be chosen when a tie occurs in Kilbridge and Wester's heuristic procedure?

(Multiple Choice)
4.9/5
(38)

Heuristic line-balancing methods are only economically feasible for job shop problems.

(True/False)
4.9/5
(39)

What is perfect balance? What are the constraints to PB?

(Essay)
4.8/5
(32)

Line balancing is the effort to reduce and match excess idle time at the workstations.

(True/False)
4.8/5
(33)