Exam 17: Cycle-Time Management Increases Productivity
Exam 1: Product Line Planning and the Systems Approach114 Questions
Exam 2: Productivity and Strategic Planning115 Questions
Exam 3: Demand Creation and Predictive Planning114 Questions
Exam 4: Understanding Quality: ITS Management and Strategic Importance114 Questions
Exam 5: Process Configuration Strategies111 Questions
Exam 6: Process Analysis and Redesign115 Questions
Exam 7: Quality Assurance115 Questions
Exam 8: Management of Technology Mot101 Questions
Exam 9: Teamwork Planning Requires Job Design113 Questions
Exam 10: Supply Chain Capacity Planning113 Questions
Exam 11: Facilities Planning: Location and Layout112 Questions
Exam 12: Materials Management Impacts All Supply Chain Participants110 Questions
Exam 13: Aggregate Planning to Balance Supply and Demand106 Questions
Exam 14: Inventory Management for Smooth and Continuous Demand Patterns114 Questions
Exam 15: Material Requirements Planning Mrp for Sporadic Demand Patterns116 Questions
Exam 16: Production Scheduling for Manufacturing and Service Operations116 Questions
Exam 17: Cycle-Time Management Increases Productivity117 Questions
Exam 18: Project Management for New Products and Processes110 Questions
Exam 19: Change Management With Faster Project Completions103 Questions
Exam 20: Sustainability Issues: Environment, Ethics, and Security111 Questions
Select questions type
Technological factors exist that do not permit operations to be split.Such physical restrictions are called zoning constraints.
(True/False)
4.7/5
(37)
Which of the following factors is an established cause of unequal total work time assignments at successive workstations?
(Multiple Choice)
4.8/5
(39)
Which of the following heuristics sets the pattern for random generation of feasible sequences?
(Multiple Choice)
4.8/5
(41)
Project management has a similar interpretation of cycle time as the flow shop.
(True/False)
4.8/5
(32)
Viewing a vending machine as a stochastic,single-channel,input-output system with Poisson arrivals and exponential service times,determine the values of Lq and Wq as well as W and L for l = 8 per minute and m = 10 per minute.These rates apply at lunch time when the school cafeteria is filled to capacity.Also,on a technical note: FIFO holds as well as all other assumptions required for the single-channel queuing model.
(Essay)
4.8/5
(43)
From a systems perspective,cycle-time management has trade-offs to consider between longer cycle times using technology and shorter cycle times using people.
(True/False)
4.8/5
(36)
It is easy to increase cycle time significantly without radically changing the factory environment.The same goes for decreasing cycle time.
(True/False)
4.9/5
(44)
With IFS,people are often an important part of the production system.
(True/False)
4.7/5
(39)
The number of workstations n must always be an integer in both theory and practice.
(True/False)
4.8/5
(33)
An agreement that the buyer makes to purchase a quantity that entitles the buyer to a discount is a JIT release.
(True/False)
4.8/5
(33)
Stochastic line balancing exists when the assumption of fixed and deterministic times for operations and total process time is not correct.
(True/False)
4.9/5
(29)
Engineering design will be the preferred method for line-balancing
(Multiple Choice)
4.9/5
(36)
At The Burger Place,Jane's toaster produces 20 finished crowns and heels per minute while Jim dresses 10 burgers per minute.They have been trained to use push-production methods.When Jane sees that Jim has no more space,she helps out at the drive-through window.What is the waiting line if they both work at rated speed for 15 minutes? How big a storage space does Jim need? How is quality affected?
(Essay)
4.9/5
(33)
Tonge's heuristic develops a learning procedure that rewards success and penalizes failure by always increasing the probability of selecting a good heuristic from a catalog of heuristics.
(True/False)
4.9/5
(39)
Which of the following is the first to be chosen when a tie occurs in Kilbridge and Wester's heuristic procedure?
(Multiple Choice)
4.9/5
(38)
Heuristic line-balancing methods are only economically feasible for job shop problems.
(True/False)
4.9/5
(39)
Line balancing is the effort to reduce and match excess idle time at the workstations.
(True/False)
4.8/5
(33)
Showing 61 - 80 of 117
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)