Exam 17: Cycle-Time Management Increases Productivity

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Line efficiency (L) is a measure used to assess line balance.It is given by Equation 17-6.Determine line efficiency for The Photo Lab where n = 4,C = 1.5 minutes,and total work content is 4.8.

(Essay)
4.7/5
(36)

Among the varying set of heuristics,which of the following choices is employed to establish preference for choosing the next operation to be assigned to a station?

(Multiple Choice)
4.8/5
(35)

Line-balancing heuristics are used when

(Multiple Choice)
4.8/5
(37)

Queuing models make certain specific assumptions.Which of the following choices are reasonable assumptions under certain circumstances?

(Multiple Choice)
4.8/5
(39)

Synchronization and orchestration are not strategic issues of cycle-time management.

(True/False)
4.8/5
(44)

The Kilbridge and Wester heuristic assigns a number to each operation describing how many predecessors it has.This is done with the help of which diagram?

(Multiple Choice)
4.8/5
(42)

_____ is commonly used to describe processes that cause a waiting line for service to form.

(Multiple Choice)
4.8/5
(34)

Lateral transferability is when precedence diagrams permit operations to be assigned to earlier but not later workstations.

(True/False)
4.7/5
(39)

From a systems perspective,cycle-time management has trade-offs to consider between

(Multiple Choice)
4.8/5
(34)

Without planning for variability,bottlenecks can arise. When bottlenecks appear,it is likely that a WIP buildup will occur.

(True/False)
4.7/5
(34)

T is the interval used to match the time dimension of the cycle time with the time dimension of the

(Multiple Choice)
4.8/5
(43)

Stochastic line-balancing exists when the assumption of fixed and deterministic times for all operations and total process time is correct.

(True/False)
4.9/5
(37)

_____ describe the length of queues and the average waiting times that can occur when lines are not balanced.

(Multiple Choice)
4.9/5
(35)

_____ describes flexibility with respect to the order in which operations will be done within a station.

(Multiple Choice)
4.9/5
(36)

For line-balancing,operation times (to be balanced at workstations) should be increased to reflect longest times that might be experienced with each operation.

(True/False)
4.7/5
(37)

What do heuristic line balancing methods employ to find near-optimal solutions for large problems? Why?

(Essay)
4.8/5
(43)

Serialized processes are comprised of operations that are _____.

(Multiple Choice)
4.8/5
(40)

Heuristic models do which of the following?

(Multiple Choice)
4.9/5
(34)

Queuing models provide descriptive measures for output rates and cycle times.They do not provide optimum solutions.

(True/False)
4.8/5
(37)

For Tonge's heuristic,all assignments are made subject to non-violation of any constraints based on precedence and zoning.

(True/False)
4.9/5
(35)
Showing 41 - 60 of 117
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)