Which of the following is a percentage measure of unproductive time at the workstations that participate in the complete process cycle?

(Multiple Choice)
4.9/5
(38)

The three classes of line-balancing are deterministic,heuristic,and stochastic.

(True/False)
4.8/5
(25)

Tactical vision is usually applied to situations with limited and/or immediate ends in view.

(True/False)
4.8/5
(29)

Stochastic line-balancing problems are related to queuing models.

(True/False)
4.9/5
(35)

Which of the following impedes productivity?

(Multiple Choice)
4.8/5
(31)

To instruct line-balancers to develop proper station layouts,which of the following are sensible statements?

(Multiple Choice)
4.8/5
(40)

_____ is a cycle-time management _____ that states that delivery of inventory to the next workstation is to be made when (and only when) that next station is ready for that delivery.Also,that delivery is a specified amount of material.

(Multiple Choice)
4.7/5
(36)

With a single-channel system,r (rho) is the average percent of time that the station is providing service.r must be

(Multiple Choice)
4.9/5
(34)

Determine line efficiency and relate it to the balance delay measure (given in Equation 17-4) for the following conditions: Total work content is 3 hours;there are 180 stations operating with a cycle time of one minute.Compare the results and meanings of d and L.

(Essay)
4.7/5
(35)

Project management's interpretation of cycle time is similar to that of the flow shop.

(True/False)
4.9/5
(32)

When operation times are randomly distributed over time,they are said to be

(Multiple Choice)
4.8/5
(35)

Precedence diagrams chart all relevant operations indicating which operations must follow others.

(True/False)
4.9/5
(41)

Cycle times of inbound and outbound supplies are interconnected with which of the following?

(Multiple Choice)
4.8/5
(36)

Perfect balance with a small amount of idle time for rest and delay is expected for a serialized system of interconnected machines.

(True/False)
4.9/5
(43)

Volume production of semiconductors reflect a unique combination of _____ in manufacturing.

(Multiple Choice)
4.9/5
(30)

Describe the behavior of a single channel system.

(Essay)
4.8/5
(45)

Why is line balancing a critical aspect of supply chain management?

(Essay)
4.8/5
(38)

Helgeson and Birnie call their approach the

(Multiple Choice)
4.8/5
(37)

Strategic thinking should include time-based and cycle-time management (TBM and CTM).

(True/False)
4.8/5
(40)

_____ is the effort to nearly equalize the output rate capabilities of successive workstations on the production line.

(Multiple Choice)
5.0/5
(26)