Exam 8: Project Scheduling
Exam 1: Projects and Project Management80 Questions
Exam 2: Process and Methods80 Questions
Exam 3: Project Management Tools80 Questions
Exam 4: Project Initiation80 Questions
Exam 5: Project Planning80 Questions
Exam 6: Risk Management80 Questions
Exam 7: Quality, Performance and Value80 Questions
Exam 8: Project Scheduling80 Questions
Exam 9: Resources, Costing, and Control80 Questions
Exam 10: Project Closure80 Questions
Exam 11: Project Organizational Structures80 Questions
Exam 12: Project Success80 Questions
Select questions type
If the optimistic time is 3,the most likely time is 5,and the pessimistic time is 7,then the expected time is
(Multiple Choice)
5.0/5
(28)
The standard deviation of the critical path is computed by summing the standard deviations of the activities.
(True/False)
4.8/5
(35)
In CCPM,a definite amount of time that can be added at the end of the project is called
(Multiple Choice)
4.8/5
(40)
Dependencies involving relationships between the project and non-project activities best defines
(Multiple Choice)
4.9/5
(38)
The CCPM method modifies the project schedule to account for limited resources.
(True/False)
4.9/5
(42)
Which of the following is a free,web-based project software package?
(Multiple Choice)
4.8/5
(40)
Contraction rate is the duration at which the project can be compressed with available resources.
(True/False)
4.8/5
(32)
In PDM,a project will have one start activity and at least two finish activities.
(True/False)
4.9/5
(33)
Which of the following usually occurs when the forward pass extends beyond the customer's requested end date?
(Multiple Choice)
4.7/5
(38)
A plan to implement a project using an ordered sequence of activities with time allotted for each activity best defines
(Multiple Choice)
4.9/5
(40)
Boeing used FastTrack for scheduling,tracking,and resource allocation throughout the Boeing 767 project.
(True/False)
4.7/5
(42)
A significant disadvantage of PDM and PERT is that they should not be used in times of uncertainty.
(True/False)
4.9/5
(34)
Which of the following is the longest path of the network,determines the total duration of the project,and is also the shortest amount of time necessary to accomplish the project?
(Multiple Choice)
4.8/5
(41)
Primary advantages of PERT are that it is flexible and easy to use.
(True/False)
5.0/5
(45)
Project time includes all the required processes to manage and complete the project in a timely fashion.
(True/False)
4.8/5
(38)
Disadvantages of accelerating the duration of a project include
(Multiple Choice)
4.9/5
(32)
The total path standard deviation can be calculated as the square root of the sum of variances of the critical path.
(True/False)
4.9/5
(48)