Exam 14: Jit and Lean Operations
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of:
(Multiple Choice)
4.9/5
(30)
If a firm's product mix is 60% of product A and 20% each of products B and C, an optimal mix-model production schedule would be successive sequences of AAABC.
(True/False)
4.8/5
(30)
Because the lean philosophy is so consequential competitively, firms are often advised to adopt it ________.
(Multiple Choice)
4.9/5
(34)
Which of the following contributes to the competitive advantage enjoyed by firms using lean production?
(Multiple Choice)
4.8/5
(30)
Although inventories are maintained, the goal of lean operations is to minimize safety stock.
(True/False)
4.8/5
(38)
Which of the following is not characteristic of preventive maintenance in lean systems?
(Multiple Choice)
4.7/5
(35)
"Preventive maintenance" is additional maintenance done immediately after a breakdown has occurred to help prevent any further breakdowns.
(True/False)
4.8/5
(32)
The Four Star Publishing Company uses sixty reams of paper each hour at one of its high speed printing stations.The cycle time for a standard container, which holds 15 reams of paper, averages forty minutes.If management has decided to use three containers, what efficiency factor was applied?
(Short Answer)
4.8/5
(32)
In lean operations, input resources arrive for processing only after the preceding batch has been completed.
(True/False)
4.9/5
(37)
In a lean environment, anything not essential to the product or process is viewed as waste.
(True/False)
4.8/5
(37)
Which of the following is characteristic of the lean philosophy?
(Multiple Choice)
4.8/5
(34)
A functioning MRP system is required prior to adopting lean planning and control systems.
(True/False)
4.9/5
(33)
A system of lights used at each workstation to signal problems or slowdowns is:
(Multiple Choice)
4.8/5
(32)
The All Seasonings Company uses 3,200 glass jars at one of its jar-filling workstations each eight hours of production.The cycle time for a standard container, which holds 90 jars, averages 45 minutes.If management uses an efficiency factor of twenty percent, how many containers should be used?
(Short Answer)
4.9/5
(32)
Which of the following questions is not answered by value stream mapping?
(Multiple Choice)
4.9/5
(39)
Which one of the following is not one of the building blocks that is the foundation of the lean philosophy?
(Multiple Choice)
4.8/5
(23)
Showing 41 - 60 of 88
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)