Exam 14: Jit and Lean Operations
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
A common objective of both MRP and the lean philosophy is to:
(Multiple Choice)
4.9/5
(37)
The use of small lot sizes in lean operations is in conflict with the EOQ approach since setup costs tend to be significantly higher than holding costs.
(True/False)
4.8/5
(37)
In a "pull system," a quantity of inventory in front of a workstation indicates problems at that workstation.
(True/False)
4.9/5
(37)
The comprehensive approach used in lean systems to deal with quality includes:
(Multiple Choice)
4.7/5
(32)
A benefit of lean systems is that lead times are increased allowing more time for processing.
(True/False)
4.9/5
(29)
Lean systems typically require that suppliers be able to provide large lots at periodic intervals.
(True/False)
4.7/5
(45)
The activities controlled in the same way by kanban and MRP II is the determination of:
(Multiple Choice)
4.8/5
(38)
The single-minute exchange of die is a system for reducing defective product.
(True/False)
4.9/5
(38)
Showing 81 - 88 of 88
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)