The average number of entities completed per unit time-the output rate-from a process is called ____.

(Multiple Choice)
4.9/5
(33)

A Department of Motor Vehicle (DMV) testing center has ten (10) testers who test 75 drivers per day. Each tester can test eight (8) drivers per day. What would the service rate need to be in order to achieve 85% utilization?

(Essay)
4.9/5
(28)

Explain why the product-process matrix does not transfer well to services.

(Essay)
4.8/5
(40)

A car rental company at a major airport has 70% of its fleet of 200 cars rented each day on average. Cars are rented for an average of 4 days. How many rentals are processed each day on average?

(Essay)
4.9/5
(37)

Give three examples of goods or services associated with each of the process types: project, job shop, flow shop and continuous flow.

(Essay)
4.7/5
(30)

In the introduction phase of the product life cycle, operations managers need to quickly standardize their processes.

(True/False)
4.9/5
(38)

An automobile emissions testing center has six (6) inspectors and tests 50 autos per hour. Each inspector can inspect twelve (12) autos per hour. What is the center's utilization?

(Essay)
4.9/5
(37)

Which of the following is not a common process design improvement strategy?

(Multiple Choice)
4.9/5
(38)

Which one of the following best describes reengineering?

(Multiple Choice)
4.7/5
(36)

The work activity that effectively limits throughput of a process is called a ____.

(Multiple Choice)
4.9/5
(28)

Little's Law

(Multiple Choice)
4.9/5
(38)

Flow shop processes are more rigid and specialized than continuous flow processes.

(True/False)
4.8/5
(33)

A legal defense preparation is an example of a project.

(True/False)
4.9/5
(33)

Explain how a product's life cycle has important implications in terms of process design and choice.

(Essay)
4.8/5
(34)

A manufacturer's average work-in-process inventory for Part 1234 is 1,250 parts. The workstation produces parts at the rate of 150 parts per day. What is the average amount of time a part spends at this workstation?

(Essay)
4.8/5
(37)

Ships, weddings and estate planning are examples of ____ goods and services.

(Multiple Choice)
4.8/5
(31)

Dell computers and Subway sandwiches are examples of ____ goods.

(Multiple Choice)
4.8/5
(32)

The Product-Process Matrix works well for both goods and services.

(True/False)
4.9/5
(36)

A custom machine shop is able to process 25 orders per day. The average processing time is 4 days. What is the average number of orders that are in process at any time?

(Essay)
4.9/5
(32)