Exam 16: Quality Control and Spc
Exam 1: Goods, Services, and Operations Management81 Questions
Exam 2: Value Chains87 Questions
Exam 3: Measuring Performance in Operations98 Questions
Exam 4: Operations Strategy82 Questions
Exam 5: Technology and Operations Management77 Questions
Exam 6: Goods and Service Design118 Questions
Exam 7: Process Selection, Design, and Analysis116 Questions
Exam 8: Facility and Work Designs92 Questions
Exam 9: Supply Chain Design87 Questions
Exam 10: Capacity Management89 Questions
Exam 11: Forecasting and Demand Planning95 Questions
Exam 12: Managing Inventories117 Questions
Exam 13: Resource Management106 Questions
Exam 14: Operations Scheduling and Sequencing79 Questions
Exam 15: Quality Management81 Questions
Exam 15: Appendix: Quality Management56 Questions
Exam 16: Quality Control and Spc110 Questions
Exam 16: Appendix: Queuing Analysis38 Questions
Exam 17: Appendix: Modeling Using Linear Programming41 Questions
Exam 17: Lean Operating Systems84 Questions
Exam 18: Appendix: Simulation40 Questions
Exam 18: Project Management108 Questions
Exam 19: Appendix: Decision Analysis44 Questions
Select questions type
Given that 20 samples are taken in a control chart initiative, the probability that 5 consecutive samples are below the center line in an R- or x-bar chart is _____.
Free
(Multiple Choice)
4.8/5
(30)
Correct Answer:
B
Which of the following statements is TRUE about common cause variations?
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
B
Alico Steel manufactures steel tubes that are used in gas grills for residential customers. The tube's overall length is crucial to assure a proper fit, and this dimension has been targeted as an important dimension to be stabilized for the steel tube manufacturing process. Gas grill performance and customer safety are key objectives and highlight the importance of producing high quality steel tubes. Tubes are cut from rolls of steel tubing using a punch press. The tubes are measured using an operationally defined method, and Table 1 below summarizes the results. Appendix B with all factors for control charts will be given as a separate class handout.Table 1 Tube Length (in centimeters)
Sample Observations 1 to 6
1 12.90 0.35 2 13.30 0.50 3 12.87 0.32 4 10.93 0.44 5 11.43 0.91 6 11.93 0.42 7 12.90 0.29 8 13.03 0.58 9 13.70 0.21 10 13.70 0.11
Total 126.69 4.13
(a) The center line for the trial R-chart is _____.
The center line for the trial X-chart is _____.
The trial UCL for the R-chart is _____.
The trial LCL for the R-chart is _____.
(b) Assuming that special causes for out-of-control situations in (a) are investigated and corrected using the seven tools of quality management, find the "final set of revised control limits" (i.e., take out any special cause sample(s) from your trial charts and recompute the following). (6 points)
The center line for the final revised R-chart is _____.
The center line for the final revised X-chart is _____.
The final revised UCL for the R-chart is _____.
The final revised LCL for the R-chart is _____.
The final revised UCL for the x-bar chart is _____.
The final revised LCL for the x-bar chart is _____.
(c)Plot the X-chart below and make sure you label the chart correctly.
(d) Is the process in statistical process control (SPC)? Justify and explain using facts. What action would you take given your "management by fact" data analysis?

Free
(Essay)
4.9/5
(29)
Correct Answer:
a)UCL range = 0.828, LCL range = 0; X-bar = 12.67, R-bar = 0.413
b)revised R-bar = 0.35, revised X-bar = 12.81, UCL range = 0.717, LCL range = 0, UCL x-bar = 12.98, LCL x-bar = 12.64)
c)Plot is totally out of statistical process control (SPC) upper and lower control limits.
d)The process is not in statistical process control (SPC); STOP the process immediately; use the Seven Quality Control (QC) tools; setup a quality team to investigate and work 24/7 (kaizen blitz); and maybe change design specifications, since current process is not capable.
Which of the following statements is NOT TRUE about special cause variations?
(Multiple Choice)
4.9/5
(45)
A Proctor and Gamble factory process fills boxes with detergent. Construct an appropriate set of control charts to monitor the process. Historical data for fill weight (in ounces) of eight samples is presented below. A sample size of six was used.
Sample Sample Mean Sample Range 1 15.80 0.42 2 16.10 0.38 3 16.02 0.08 4 15.95 0.15 5 16.12 0.42 6 16.18 0.23 7 15.87 0.36 8 16.20 0.40 Worksheet (this will not be graded but will help you answer exam questions)
-For the Proctor and Gamble detergent box problem, based on the control charts it can be said that _____.


(Multiple Choice)
4.8/5
(34)
When the range of process variation does not conform to the design specifications, the process capability index will be less than 1.
(True/False)
4.8/5
(33)
Honda wants to monitor the number of blemishes (scratches, blisters, etc.) on the fenders of its cars using a statistical process control chart. The most appropriate type of statistical process control (SPC) chart that can be used in this scenario is a(n) _____.
(Multiple Choice)
4.8/5
(35)
In manufacturing, quality control is generally applied at the receiving stage from suppliers, during various production processes, and at the finished-goods stage.
(True/False)
4.9/5
(36)
Flaws are counted on a standard steel plate (sheet). Each sheet has the exact same dimensions. Ten sheets are selected at random and the number of flaws per sheet is as follows:
Sheet Number of Flaws 1 3 2 1 3 3 4 0 5 2 6 2 7 0 8 1 9 1 10 2 Determine the lower and upper control limits for a c-chart.
(Essay)
4.9/5
(30)
A bottling machine fills soft drink bottles with an average of 12.000 ounces with a standard deviation of 0.002 ounces. Determine the process capability index, Cp, if the design specification for the fill weight of the bottles is 12.000 ounces plus or minus 0.015 ounces.
(Essay)
4.9/5
(37)
A manufacturing company has a production process that has a target percentage of nonconformance as 4 percent which was developed based on numerous samples of 200 observations each. They want to develop control charts using 3 standard deviation limits.
a.What is the center line for the p-chart?
b.What is the upper control limit for a p-chart?
c.What is the lower control limit for a p-chart?
(Essay)
4.9/5
(34)
Which of the following is most closely related to a discrete metric?
(Multiple Choice)
4.8/5
(33)
Table 1-Statistical Process Control (SPC) Problem Data for Service Waiting Times
Sample Number \multicolumn 3 |c| Observation Number 1 2 3 1 9.6 10.2 9.8 2 9.4 10.0 10.4 3 9.9 9.6 9.0 4 9.3 10.5 9.9 5 9.7 9.2 9.7
-Given the previous results and analysis for the R-chart regarding service waiting times, one would:
(Multiple Choice)
4.8/5
(35)
Over several days, 25 samples of 100 items each were tested for electrical resistance. A total of 60 items failed. Determine the control limits for a p-chart.
(Essay)
4.8/5
(38)
A key element of a control system is the ability to measure performance and compare it to a performance standard.
(True/False)
4.9/5
(35)
Define and give an example of the three components of any control system.
(Essay)
4.8/5
(40)
If process quality approaches six sigma levels, then standard types of control charts are not useful.
(True/False)
4.9/5
(33)
Table 1-Statistical Process Control (SPC) Problem Data for Service Waiting Times
Sample Number \multicolumn 3 |c| Observation Number 1 2 3 1 9.6 10.2 9.8 2 9.4 10.0 10.4 3 9.9 9.6 9.0 4 9.3 10.5 9.9 5 9.7 9.2 9.7
-In Table 1, the sample values represent service waiting times in minutes. For the R-chart, what is the value of UCLR?
(Multiple Choice)
4.9/5
(45)
A Proctor and Gamble factory process fills boxes with detergent. Construct an appropriate set of control charts to monitor the process. Historical data for fill weight (in ounces) of eight samples is presented below. A sample size of six was used.
Sample Sample Mean Sample Range 1 15.80 0.42 2 16.10 0.38 3 16.02 0.08 4 15.95 0.15 5 16.12 0.42 6 16.18 0.23 7 15.87 0.36 8 16.20 0.40 Worksheet (this will not be graded but will help you answer exam questions)
-For the Proctor and Gamble detergent box problem, the lower control limit for the x-bar chart is _____.


(Multiple Choice)
4.9/5
(32)
Showing 1 - 20 of 110
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)