Exam 14: Operations Scheduling and Sequencing
Exam 1: Goods, Services, and Operations Management81 Questions
Exam 2: Value Chains87 Questions
Exam 3: Measuring Performance in Operations98 Questions
Exam 4: Operations Strategy82 Questions
Exam 5: Technology and Operations Management77 Questions
Exam 6: Goods and Service Design118 Questions
Exam 7: Process Selection, Design, and Analysis116 Questions
Exam 8: Facility and Work Designs92 Questions
Exam 9: Supply Chain Design87 Questions
Exam 10: Capacity Management89 Questions
Exam 11: Forecasting and Demand Planning95 Questions
Exam 12: Managing Inventories117 Questions
Exam 13: Resource Management106 Questions
Exam 14: Operations Scheduling and Sequencing79 Questions
Exam 15: Quality Management81 Questions
Exam 15: Appendix: Quality Management56 Questions
Exam 16: Quality Control and Spc110 Questions
Exam 16: Appendix: Queuing Analysis38 Questions
Exam 17: Appendix: Modeling Using Linear Programming41 Questions
Exam 17: Lean Operating Systems84 Questions
Exam 18: Appendix: Simulation40 Questions
Exam 18: Project Management108 Questions
Exam 19: Appendix: Decision Analysis44 Questions
Select questions type
The time to rest and travel between games for baseball umpire crews is an important factor in developing their schedule.
Free
(True/False)
4.9/5
(31)
Correct Answer:
True
Scheduling and sequencing methods used in manufacturing are more beneficial in low-contact, than high-contact, service processes.
Free
(True/False)
4.7/5
(40)
Correct Answer:
True
The sequencing rule that minimizes the maximum number of jobs that are past due from a given set of jobs is:
Free
(Multiple Choice)
4.8/5
(43)
Correct Answer:
B
Which one of the following statements about the Balloons Aloha case study on scheduling and sequencing is TRUE?
(Multiple Choice)
4.9/5
(35)
Flow time is the amount of time a job spends in a shop or factory.
(True/False)
4.8/5
(37)
Like the shortest processing time (SPT) rule, the earliest due date (EDD) rule minimizes the average flow time.
(True/False)
5.0/5
(35)
Telling an umpire crew to work baseball games in Chicago, then Milwaukee, and then Cleveland is an example of a sequence.
(True/False)
4.9/5
(35)
An airplane repair facility has a contract to repair cargo aircrafts for a regional airline. There are 62 planes in the airline company's fleet of planes. Because of the punishing workload, the planes require a considerable amount of maintenance. The repair facility is trying to determine how to schedule the needed repairs. They want to compare the shortest processing time (SPT) rule and the first come, first served (FCFS) rule. Currently, the following planes need repair and are in the repair facility (data given is in the order of plane arrival, only one plane is worked on at a time, and the shop is open 24 hours a day, 7 days a week).
Plane Estimated repair time A342 4 hours B554 26 hours C222 2 hours D876 16 hours E211 9 hours F887 6 hours
a.In what order should the planes be repaired using the shortest processing time rule (use first letter of plane)?
b.What is the average time (in hours) in the shop using the shortest processing time (SPT) rule?
c.What is the average time (in hours) in the shop using the first come, first served (FCFS) rule?
(Essay)
4.9/5
(39)
The table below includes processing times and due dates for five jobs.
Processing Days Due Job Time (days) From Today A 16 24 B 23 30 C 22 40 D 8 28 E 10 18
-Using the earliest due date (EDD) rule, the average flow time for the five jobs is _____.
(Multiple Choice)
4.8/5
(33)
The numerical difference between the completion time and the due date is called:
(Multiple Choice)
4.8/5
(35)
UPS, the world's largest package delivery company, is highly dependent on scheduling but not sequencing.
(True/False)
4.8/5
(35)
Tardiness measures the amount of time by which the completion time exceeds the due date.
(True/False)
4.9/5
(39)
Describe the algorithm that defines Johnson's sequencing rule for the two-resource sequencing problem.
(Essay)
4.7/5
(30)
The table below includes processing times and due dates for five jobs.
Processing Days Due Job Time (days) From Today A 16 24 B 23 30 C 22 40 D 8 28 E 10 18
-Using the earliest due date (EDD) rule, the average lateness for the five jobs is _____.
(Multiple Choice)
4.9/5
(37)
Which of the following is an example of a situation for which a Gantt chart would be appropriate?
(Multiple Choice)
4.8/5
(28)
Scheduling refers to determining the order in which jobs or tasks are processed.
(True/False)
4.8/5
(37)
Showing 1 - 20 of 79
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)