Controls can be established at any point during a project but should follow the maxim "more control is better."

Free
(True/False)
4.8/5
(32)
Correct Answer:
Verified

False

A project management firm that promises to do everything for a major project and hand over a fully functional,ready-to-use deliverable is performing under a(n):

Free
(Multiple Choice)
4.9/5
(42)
Correct Answer:
Verified

D

Rank the key steps in information development from most to least important and justify your rankings.

Free
(Essay)
4.7/5
(29)
Correct Answer:
Verified

Rankings will vary,but the key steps in information development are and always will be:
Problem or need statement - why is there a need in search of a solution,what is the underlying problem,and what does the project intend to do?
Information gathering - research to gather all relevant data for the project.
Constraints - time,budget,and client constraints that may affect project development.
Alternative analysis - different solution methods for the problem targeted by the project.
Project objectives - final objectives for the project in terms of outputs,required resources,and timing.

Which pair of statements is BEST?

(Multiple Choice)
4.8/5
(36)

What are two common reasons that project or specification changes must be made?

(Essay)
4.8/5
(36)

The Scope Management chapter begins and ends with the quote,"It's a dream until you write it down.Then it's:

(Multiple Choice)
4.8/5
(37)

Which of these is NOT an element of project scope management?

(Multiple Choice)
4.9/5
(40)

The status accounting step of configuration management functions primarily as:

(Multiple Choice)
4.9/5
(39)

The project's scope fixed at a specific point in time is the:

(Multiple Choice)
4.9/5
(34)

In the case of projects developed for external clients,work authorization typically addresses:

(Multiple Choice)
4.9/5
(36)

What is organization breakdown structure?

(Essay)
4.8/5
(30)

Develop a responsibility assignment matrix for your semester project.Provide a brief (two or three sentence)description of your project and its current state.

(Essay)
4.7/5
(37)

The step that reflects the formal "go ahead" given to the project to commence once the scope definition,planning documents,and other contractual documents have been prepared and approved is the:

(Multiple Choice)
4.9/5
(38)

Project closeout documentation that can be used to predict trends,analyze feasibility,and highlight problem areas for similar future projects is:

(Multiple Choice)
4.7/5
(38)

What are work breakdown structure elements that must be completed to conclude the project deliverables?

(Multiple Choice)
4.7/5
(35)

The stage of configuration management where the breakdown of the project to the necessary level of definition is identified as:

(Multiple Choice)
4.8/5
(49)

A comprehensive statement of work includes an estimate of time and costs,resource requirements,and the scope of the work to be performed.

(True/False)
4.9/5
(43)

What is the difference between a turnkey contract and a cost-plus contract? Include in your discussion the advantages and disadvantages of each.

(Essay)
4.9/5
(27)

A lump-sum contract requires the customer to pay for the full delivered price of the project before any work is done.

(True/False)
4.8/5
(39)

Which of these scope statement steps creates the all-important bureaucracy for a project?

(Multiple Choice)
4.8/5
(33)
Showing 1 - 20 of 103