Exam 9: Location and Layout
Exam 1: Creating Customer Value Through Operations92 Questions
Exam 2: Supply Chain Management100 Questions
Exam 3: Process Configuration114 Questions
Exam 4: Capacity101 Questions
Exam 5: Inventory Management152 Questions
Exam 6: Quality and Process Improvement197 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects152 Questions
Exam 9: Location and Layout197 Questions
Exam 10: Managing Demand and Forecasting139 Questions
Exam 11: Operations Planning and Scheduling123 Questions
Exam 12: Resource Planning151 Questions
Exam 13: Waiting Lines93 Questions
Exam 14: Decision Making73 Questions
Exam 15: Financial Analysis41 Questions
Exam 16: Work Measurement97 Questions
Exam 17: Learning Curve Analysis44 Questions
Exam 18: Computer-Integrated Manufacturing53 Questions
Exam 19: Acceptance Sampling Plans71 Questions
Exam 20: Simulation36 Questions
Exam 21: Special Inventory Models32 Questions
Exam 22: Linear Programming47 Questions
Select questions type
Table 9.21
Table 7.21 The following information is given about an assembly line.
The desired output rate is 90 units per hour.
-Use the information in Table 9.21.Suppose that the desired output rate is increased to 120 units per hour and a solution has been found that has 4 workstations.What is the efficiency of this new assembly line?

(Multiple Choice)
4.8/5
(35)
Table 9.2
Durham Toy,Inc.has five distribution centers at the location coordinates
given as follows.The monthly demand at each center is also given.
-Use the information in Table 9.2.If the plant is located at A,what is the total load-distance score,assuming rectilinear distance?

(Multiple Choice)
4.9/5
(37)
One common performance criteria for layouts is capital investment.
(True/False)
4.8/5
(42)
A(n)________ gives the number of trips for some other measure of materials movement between each pair of departments per day.
(Essay)
4.9/5
(31)
A firm of four departments has the following trip matrix and current block plan of all departments:
a.What is the load-distance score for the current layout? (Assume rectilinear distance and that the distance between departments A and B is one unit of distance. )
b.What would be the load-distance score for the following layout?




(Essay)
4.9/5
(27)
Table 9.22
The production of a particular product consists of seven work elements.The desired output rate is 60 units per hour.The work element and their precedence relationships are given.
-Use the information in Table 9.22.What is the efficiency of the line created using the longest work-element time rule?

(Multiple Choice)
4.9/5
(41)
A product layout groups workstations according to function rather than arranging workstations in a linear path.
(True/False)
4.9/5
(36)
A layout that groups workstations or departments according to function is referred to as a flexible-flow layout.
(True/False)
4.7/5
(29)
Paced lines require that inventory storage areas be placed between stations.
(True/False)
4.8/5
(39)
Table 9.15
Balance the following line for an output rate of 3 units per minute,
using the longest work-element time rule.
-Use the information in Table 9.15.What is the balance delay for your solution?

(Multiple Choice)
4.9/5
(34)
Which one of the following statements about product layout is best?
(Multiple Choice)
4.8/5
(26)
Which of the following is an advantage or characteristic of a process layout over a product layout when volumes are low?
(Multiple Choice)
4.9/5
(33)
Which one of the following statements about layout is best?
(Multiple Choice)
4.9/5
(33)
The point has been reached where a biotechnology research and development company must expand by building a new facility.The search has been narrowed to four locations,all of which are acceptable to management.The assessment of these sites is being made on the basis of the six subjective location factors that follow.Management has agreed to use a five-point scale (Excellent = 5,Very good = 4,Good = 3,Fair = 2,Poor = 1)to quantify and compare their subjective opinions about the relative goodness of the sites).The weight reflects the importance of each factor in the decision. Factor Evaluation by Location
Calculate the weighted score for each alternative.Which location would you recommend?

(Multiple Choice)
4.9/5
(44)
Table 9.12
A company with a process layout wants to rearrange its facility in the space available.There are six departments,and the flow among them is given in the following trip matrix.The shape and the size of the space available is also given.Assume rectilinear distances.
Trips Between Departments
Location Positions
-Use the information from Table 9.12.What is the load-distance score if the departments were assigned as follows? (Continue assuming rectilinear distances. )


(Multiple Choice)
4.8/5
(31)
The balance delay is the amount by which efficiency falls short of 100 percent.
(True/False)
4.9/5
(32)
________ is the amount by which efficiency falls short of 100 percent.
(Essay)
4.8/5
(38)
Table 9.2
Durham Toy,Inc.has five distribution centers at the location coordinates
given as follows.The monthly demand at each center is also given.
-Use the information in Table 9.2.If the plant is located at the center of gravity,what is the load-distance score,assuming Euclidean distance?

(Multiple Choice)
4.7/5
(41)
Table 9.3
A firm has the following demand forecasts for the five markets that it serves:
-Use the information in Table 9.3.If the firm decides to locate the warehouse at point D,what is the total load-distance score? (Use rectilinear distance).

(Multiple Choice)
4.8/5
(38)