Exam 22: Acceptance Sampling Plans
Exam 1: Using Operations to Create Value100 Questions
Exam 2: Process Strategy and Analysis245 Questions
Exam 3: Quality and Performance195 Questions
Exam 4: Capacity Planning108 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems164 Questions
Exam 7: Project Management140 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management207 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning125 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration111 Questions
Exam 15: Supply Chain Sustainability73 Questions
Exam 16: Decision Making107 Questions
Exam 17: Waiting Lines108 Questions
Exam 18: Special Inventory Models53 Questions
Exam 19: Linear Programming86 Questions
Exam 20: Simulation54 Questions
Exam 21: Financial Analysis55 Questions
Exam 22: Acceptance Sampling Plans87 Questions
Exam 23: Measuring Output Rates106 Questions
Exam 24: Learning Curve Analysis51 Questions
Exam 25: Operations Scheduling120 Questions
Exam 26: Layout36 Questions
Select questions type
Which one of the following actions will decrease the producer's risk?
Free
(Multiple Choice)
4.7/5
(36)
Correct Answer:
B
A single-sampling plan by attributes is needed for a purchased component.Given the following information,what is the producer's risk? Table G.1 is appended to this exam. Sample size = 75
Acceptance number (c)= 2
Acceptance quality level (AQL )= 0.01
Lot tolerance proportion defective (LTPD)= 0.04
Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
D
Which one of the following alternatives will reduce the producer's risk for a given AQL and LTPD?
Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
A
Lot tolerance proportion defective (LTPD)can be defined as the:
(Multiple Choice)
5.0/5
(37)
________ is the worst level of quality that the customer can tolerate.
(Essay)
4.7/5
(41)
Acceptance sampling is an inspection procedure used to determine whether to accept or reject a specific quantity of material.
(True/False)
4.9/5
(36)
If the sample size is increased and the acceptance level is unchanged,the OC curve will have a higher consumer's risk.
(True/False)
4.7/5
(32)
Which one of the following will increase the consumer's risk?
(Multiple Choice)
4.8/5
(30)
An operating characteristic curve is a plot of the probability of accepting the lot against the proportion defectives.
(True/False)
4.8/5
(44)
A company wants to develop an acceptance sampling plan that keeps the producer's risk at 0.03 or less and the customer's risk at 0.10 or less.The acceptable quality level (AQL)is 0.01,and the lot tolerance proportion defective (LTPD)has been set at 0.10.Which one of the following plans gives us the desired protection? Table G.1 is appended to this exam.
(Multiple Choice)
4.8/5
(36)
An item is purchased with one surface polished to a specified finish quality.From each incoming shipment,a sample of items is randomly selected and the polished surface of each sample item is compared with a standard and judged to be either acceptable or unacceptable.The following parameters have been established: AQL = 0.02,= 0.05,LTPD = 0.09,and = 0.10.Table G.1 is appended to this exam.What are the sample size and the acceptance number?
(Multiple Choice)
4.9/5
(29)
Use Table G.1 for the following question.What is the acceptance number of a single-sampling plan if n = 400,AQL = 0.002,and α= 0.01?
(Multiple Choice)
4.7/5
(38)
A lot of 2,000 items has just arrived.A single sampling calls for a sample size of 100 and c = 3.What is the average outgoing quality limit,assuming that all defectives in the entire lot are replaced if it is rejected and all defectives are replaced in the sample if it is accepted? Table G.1 is appended to this exam.
(Multiple Choice)
4.9/5
(35)
A sample of 100 items is randomly selected from a shipment of incoming materials.AQL and LTPD have been established at 0.01 and 0.07,respectively.When four or more defective items are found in a sample,the shipment is rejected.What is the value of β? Table G.1 is appended to this exam.
(Multiple Choice)
4.7/5
(35)
Rectified inspection occurs when all defective items in the lot are replaced with good items if the lot is rejected and any defective items in the samples are replaced if the lot is accepted.
(True/False)
4.9/5
(31)
This OC curve represents a sampling plan developed for a lot size of 1000,a sample size of 15,and an acceptance number of 2.The probability of acceptance for each of the first six points appears next to the plotted point.What is the average outgoing quality for an incoming fraction defective of 0.25? 

(Multiple Choice)
4.8/5
(32)
A single-sampling plan by attributes is needed for a purchased component.Given the following information,what is the consumer's risk? Table G.1 is appended to this exam. Sample size = 50
Acceptance number (c)= 3
Acceptance quality level (AQL )= 0.01
Lot tolerance proportion defective (LTPD)= 0.04