Exam 11: Resource Planning

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

Which of the following is a back-office module in a typical ERP system?

Free
(Multiple Choice)
4.7/5
(33)
Correct Answer:
Verified

D

Which of the following is NOT used to derive an item's gross requirements?

Free
(Multiple Choice)
4.9/5
(37)
Correct Answer:
Verified

C

What are the differences and similarities among material requirements planning,manufacturing resource planning,and enterprise resource planning systems?

Free
(Essay)
4.8/5
(29)
Correct Answer:
Verified

The materials requirement planning (MRP)system can be considered a subset of the manufacturing resource planning (MRP II)system,containing all of the production-related capabilities without the tie-in to the company's financial and other core and supporting process systems.The MRP II system could be considered a subset of an enterprise resource planning (ERP)system,containing everything an ERP system has without the single source of data,streamlined data flows,and availability of a wealth of real-time information for all employees.

ERP revolves around a(n)________.

(Essay)
4.7/5
(31)

If a planned receipt for an item is due in week 6 and the item's lead time is two weeks,in which week will the corresponding planned order release occur?

(Multiple Choice)
4.8/5
(28)

Which of the following statements about service resource planning is TRUE?

(Multiple Choice)
4.7/5
(38)

Scenario 11.3 Use this bill of materials and inventory records to answer the questions. Scenario 11.3 Use this bill of materials and inventory records to answer the questions.     -Use Scenario 11.3 to answer this question.How many units of F are required to produce 17 end items? Scenario 11.3 Use this bill of materials and inventory records to answer the questions.     -Use Scenario 11.3 to answer this question.How many units of F are required to produce 17 end items? -Use Scenario 11.3 to answer this question.How many units of F are required to produce 17 end items?

(Multiple Choice)
4.9/5
(36)

The portion of the master production schedule farthest into the future is often frozen to reduce forecasting requirements.

(True/False)
4.9/5
(29)

________ is a technique used for projecting time-phased capacity requirements for workstations.

(Essay)
4.8/5
(30)

Operations produces a number of items in one production period.Those items that are not produced for a specific customer order are ________.

(Essay)
4.8/5
(28)

Lot-for-lot (L4L)is a rule that maintains the same order quantity each time an order is issued.

(True/False)
4.8/5
(32)

Scenario 11.2 Scenario 11.2     Inventory amounts indicated in the table are available to produce the end item indicated in this bill of materials. -Use Figure Scenario 11.2 to answer this question.How many additional units of P are needed to produce ten end items? Scenario 11.2     Inventory amounts indicated in the table are available to produce the end item indicated in this bill of materials. -Use Figure Scenario 11.2 to answer this question.How many additional units of P are needed to produce ten end items? Inventory amounts indicated in the table are available to produce the end item indicated in this bill of materials. -Use Figure Scenario 11.2 to answer this question.How many additional units of P are needed to produce ten end items?

(Multiple Choice)
4.9/5
(27)

A front-office module for an ERP system includes:

(Multiple Choice)
4.9/5
(37)

Scenario 11.3 Use this bill of materials and inventory records to answer the questions. Scenario 11.3 Use this bill of materials and inventory records to answer the questions.     -Use Scenario 11.3 to answer this question.How many units of N are required to produce 25 end items? Scenario 11.3 Use this bill of materials and inventory records to answer the questions.     -Use Scenario 11.3 to answer this question.How many units of N are required to produce 25 end items? -Use Scenario 11.3 to answer this question.How many units of N are required to produce 25 end items?

(Multiple Choice)
4.8/5
(32)

Consider the MPS,BOM,and inventory data shown. Master Production Schedule: The following table shows the MPS start quantities for the next 10 weeks. Consider the MPS,BOM,and inventory data shown. Master Production Schedule: The following table shows the MPS start quantities for the next 10 weeks.    Bill of Material: - Item A uses 2 each of component D,1 each of component C and 2 each of subassembly B. - Subassembly B uses 2 each of component E. Selected Inventory Data:    Construct the MRP schedule using the preceding information.Blank MRP records are provided at the end of this test. Bill of Material: - Item A uses 2 each of component D,1 each of component C and 2 each of subassembly B. - Subassembly B uses 2 each of component E. Selected Inventory Data: Consider the MPS,BOM,and inventory data shown. Master Production Schedule: The following table shows the MPS start quantities for the next 10 weeks.    Bill of Material: - Item A uses 2 each of component D,1 each of component C and 2 each of subassembly B. - Subassembly B uses 2 each of component E. Selected Inventory Data:    Construct the MRP schedule using the preceding information.Blank MRP records are provided at the end of this test. Construct the MRP schedule using the preceding information.Blank MRP records are provided at the end of this test.

(Essay)
4.8/5
(41)

Which of the following statements about MRP II is BEST?

(Multiple Choice)
4.8/5
(37)

A parent is any item manufactured from one or more components.

(True/False)
4.9/5
(32)

Explain why,in a dependent demand environment,MRP does a better job of estimating the need to replenish inventory items than does the reorder point system.

(Essay)
4.7/5
(37)

Use the following partially completed MRP record to answer the question. Use the following partially completed MRP record to answer the question.   What are the quantities of planned order releases for item XYZ for the first six weeks (weeks 1,2,3,4,5,and 6)? What are the quantities of planned order releases for item XYZ for the first six weeks (weeks 1,2,3,4,5,and 6)?

(Multiple Choice)
4.7/5
(36)

If the demand for an independent demand item is continuous and uniform,so will the planned order releases of its components.

(True/False)
4.7/5
(26)