Exam 11: Resource Planning
Exam 1: Using Operations to Create Value100 Questions
Exam 2: Process Strategy and Analysis245 Questions
Exam 3: Quality and Performance195 Questions
Exam 4: Capacity Planning108 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems164 Questions
Exam 7: Project Management140 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management207 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning125 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration111 Questions
Exam 15: Supply Chain Sustainability73 Questions
Exam 16: Decision Making107 Questions
Exam 17: Waiting Lines108 Questions
Exam 18: Special Inventory Models53 Questions
Exam 19: Linear Programming86 Questions
Exam 20: Simulation54 Questions
Exam 21: Financial Analysis55 Questions
Exam 22: Acceptance Sampling Plans87 Questions
Exam 23: Measuring Output Rates106 Questions
Exam 24: Learning Curve Analysis51 Questions
Exam 25: Operations Scheduling120 Questions
Exam 26: Layout36 Questions
Select questions type
Which of the following is a back-office module in a typical ERP system?
Free
(Multiple Choice)
4.7/5
(33)
Correct Answer:
D
Which of the following is NOT used to derive an item's gross requirements?
Free
(Multiple Choice)
4.9/5
(37)
Correct Answer:
C
What are the differences and similarities among material requirements planning,manufacturing resource planning,and enterprise resource planning systems?
Free
(Essay)
4.8/5
(29)
Correct Answer:
The materials requirement planning (MRP)system can be considered a subset of the manufacturing resource planning (MRP II)system,containing all of the production-related capabilities without the tie-in to the company's financial and other core and supporting process systems.The MRP II system could be considered a subset of an enterprise resource planning (ERP)system,containing everything an ERP system has without the single source of data,streamlined data flows,and availability of a wealth of real-time information for all employees.
If a planned receipt for an item is due in week 6 and the item's lead time is two weeks,in which week will the corresponding planned order release occur?
(Multiple Choice)
4.8/5
(28)
Which of the following statements about service resource planning is TRUE?
(Multiple Choice)
4.7/5
(38)
Scenario 11.3
Use this bill of materials and inventory records to answer the questions.
-Use Scenario 11.3 to answer this question.How many units of F are required to produce 17 end items?


(Multiple Choice)
4.9/5
(36)
The portion of the master production schedule farthest into the future is often frozen to reduce forecasting requirements.
(True/False)
4.9/5
(29)
________ is a technique used for projecting time-phased capacity requirements for workstations.
(Essay)
4.8/5
(30)
Operations produces a number of items in one production period.Those items that are not produced for a specific customer order are ________.
(Essay)
4.8/5
(28)
Lot-for-lot (L4L)is a rule that maintains the same order quantity each time an order is issued.
(True/False)
4.8/5
(32)
Scenario 11.2
Inventory amounts indicated in the table are available to produce the end item indicated in this bill of materials.
-Use Figure Scenario 11.2 to answer this question.How many additional units of P are needed to produce ten end items?


(Multiple Choice)
4.9/5
(27)
Scenario 11.3
Use this bill of materials and inventory records to answer the questions.
-Use Scenario 11.3 to answer this question.How many units of N are required to produce 25 end items?


(Multiple Choice)
4.8/5
(32)
Consider the MPS,BOM,and inventory data shown.
Master Production Schedule:
The following table shows the MPS start quantities for the next 10 weeks.
Bill of Material:
- Item A uses 2 each of component D,1 each of component C and 2 each of subassembly B.
- Subassembly B uses 2 each of component E.
Selected Inventory Data:
Construct the MRP schedule using the preceding information.Blank MRP records are provided at the end of this test.


(Essay)
4.8/5
(41)
Explain why,in a dependent demand environment,MRP does a better job of estimating the need to replenish inventory items than does the reorder point system.
(Essay)
4.7/5
(37)
Use the following partially completed MRP record to answer the question.
What are the quantities of planned order releases for item XYZ for the first six weeks (weeks 1,2,3,4,5,and 6)?

(Multiple Choice)
4.7/5
(36)
If the demand for an independent demand item is continuous and uniform,so will the planned order releases of its components.
(True/False)
4.7/5
(26)