What does an advanced planning system do and what are the functions of the major components?

Free
(Essay)
4.9/5
(28)
Correct Answer:
Verified

An advanced planning system (APS)optimizes resources across the supply chain and aligns daily operations with strategic goals.The systems typically have these components: demand planning,supply network planning,available-to-promise,and manufacturing scheduling.The demand-planning module enables companies in a supply chain to share demand forecasts.The supply-network planner contains optimization models based on linear programming to make long-term decisions such as the number and location of plants and distribution centers.The available-to-promise module checks the availability of components and materials,enabling the firm to promise delivery.The manufacturing scheduling component determines an optimal grouping and sequencing of manufacturing orders.

What is a product family?

Free
(Essay)
4.9/5
(42)
Correct Answer:
Verified

A product family is a group of products or services that has similar demand requirements and common processing,labor,and / or materials requirements.

Table 10.8 Suppose that the following eight jobs must be scheduled through a car repair facility (repair times are shown in days): Table 10.8 Suppose that the following eight jobs must be scheduled through a car repair facility (repair times are shown in days):    -Use the information in Table 10.8 to answer this question.What is the flow time of car B if an SPT sequence is obeyed? -Use the information in Table 10.8 to answer this question.What is the flow time of car B if an SPT sequence is obeyed?

Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
Verified

C

Firms that are most likely to use backlogs tend to have a make-to-order strategy.

(True/False)
4.8/5
(38)

A sales and operations plan is sometimes called a(n)________.

(Essay)
5.0/5
(33)

Job flow time is defined as the:

(Multiple Choice)
4.8/5
(32)

The Gantt chart can be used as a tool for sequencing work on machines and monitoring its progress.

(True/False)
4.8/5
(32)

Which one of the following conditions favors a level strategy for manufacturing firms?

(Multiple Choice)
4.8/5
(38)

Table 10.1 Bart Incorporated manufactures rotary air fans and uses a production-planning horizon of one-half year.It allows for regular time,part time,overtime,and subcontracting production to meet the demand but no more than 12 units may be made by each of these methods.Both anticipation inventory and backorders are allowed.The beginning (or current)inventory is 20 units.Their first attempt at a sales and operations plan has resulted in the following. Table 10.1 Bart Incorporated manufactures rotary air fans and uses a production-planning horizon of one-half year.It allows for regular time,part time,overtime,and subcontracting production to meet the demand but no more than 12 units may be made by each of these methods.Both anticipation inventory and backorders are allowed.The beginning (or current)inventory is 20 units.Their first attempt at a sales and operations plan has resulted in the following.    -Use the information in Table 10.1.If the firm is committed to the regular production and overtime production as shown,what level of anticipation inventory would be needed at the start of the first month to result in an ending inventory of zero after month 6? -Use the information in Table 10.1.If the firm is committed to the regular production and overtime production as shown,what level of anticipation inventory would be needed at the start of the first month to result in an ending inventory of zero after month 6?

(Multiple Choice)
4.8/5
(29)

Undertime is the situation that occurs when employees do not have enough productive work for the regular-time workday or workweek.

(True/False)
4.8/5
(38)

A retailer experiences a seasonal demand pattern for its services.Labor requirements over a typical six-month period follow. A retailer experiences a seasonal demand pattern for its services.Labor requirements over a typical six-month period follow.    Costs associated with operations are as follows: Wages = $2,000 per worker per month Hiring cost = $1,000 per worker Layoff cost = $1,500 per worker The current workforce level is 10 workers.Use the spreadsheet approach and the preceding data to answer the following questions: a.What is the total cost of a staffing plan,including the cost of regular wages,hiring,and layoffs using a chase strategy with hiring and layoffs,but no overtime? b.What is the total cost of the staffing plan,using a level strategy in which no overtime is allowed and the undertime paid for? c.Suppose that overtime is allowed up to 25% of the regular-time capacity,and that overtime wages are 150% of the regular-time rate.What is the total cost of the level strategy with overtime and undertime that also minimizes undertime? Costs associated with operations are as follows: Wages = $2,000 per worker per month Hiring cost = $1,000 per worker Layoff cost = $1,500 per worker The current workforce level is 10 workers.Use the spreadsheet approach and the preceding data to answer the following questions: a.What is the total cost of a staffing plan,including the cost of regular wages,hiring,and layoffs using a chase strategy with hiring and layoffs,but no overtime? b.What is the total cost of the staffing plan,using a level strategy in which no overtime is allowed and the undertime paid for? c.Suppose that overtime is allowed up to 25% of the regular-time capacity,and that overtime wages are 150% of the regular-time rate.What is the total cost of the level strategy with overtime and undertime that also minimizes undertime?

(Essay)
4.8/5
(40)

The ________ is a schedule that specifies the timing and size of production quantities for each product in the product family.

(Essay)
4.8/5
(34)

A rotating schedule calls for each employee to work the same days and hours each week.

(True/False)
4.9/5
(33)

The plans for the components,purchased materials,and workstations are developed in the:

(Multiple Choice)
4.8/5
(40)

How is the sales and operations planning process similar to the forecasting process?

(Essay)
4.8/5
(33)

When performing sales and operations planning,companies can aggregate products or services but not members of their workforce.

(True/False)
4.8/5
(31)

Table 10.2 Archie Toys is a retailer operating out of Wichita,Kansas.It experiences a seasonal demand pattern for its services.Labor requirements over a typical six-month period follow.The workforce requirements (expressed as number of employees)are given in the following table for the next six periods. Table 10.2 Archie Toys is a retailer operating out of Wichita,Kansas.It experiences a seasonal demand pattern for its services.Labor requirements over a typical six-month period follow.The workforce requirements (expressed as number of employees)are given in the following table for the next six periods.   Costs associated with operations are as follows: Wages = $800 per worker per month Hiring cost = $300 per worker Layoff cost = $200 per worker The current workforce level is nine workers,and the undertime is paid for.Use the spreadsheet approach and the preceding data to answer the following questions. -Use the information in Table 10.2.The total cost of the staffing plan,using a level strategy in which no overtime is allowed and the undertime paid for,is: Costs associated with operations are as follows: Wages = $800 per worker per month Hiring cost = $300 per worker Layoff cost = $200 per worker The current workforce level is nine workers,and the undertime is paid for.Use the spreadsheet approach and the preceding data to answer the following questions. -Use the information in Table 10.2.The total cost of the staffing plan,using a level strategy in which no overtime is allowed and the undertime paid for,is:

(Multiple Choice)
4.9/5
(29)

________ is the amount of time by which a job missed its due date.

(Essay)
4.8/5
(31)

Which one of the following statements about managerial inputs to production and staffing plans is BEST?

(Multiple Choice)
4.8/5
(29)

The time that employees work that is longer than the regular workday or workweek for which they receive additional pay is: